Fetco CBS-1131-XV+ User's Manual & Operating Manual

Manual is about: CBS-1130 EXTRACTOR V+

Summary of CBS-1131-XV+

  • Page 1

    User’s guide & operator instructions fetco coffee brewer: cbs-1130 extractor ® v+ ™ cbs-1131-xv+ cbs-1132-xv+ table of contents specifications and requirements .................................. 2 rough-in drawings ........................................................ 2 electrical and output spec...

  • Page 2

    Go to fetco.Com for the latest versions of all information page 2 user guide & operator instructions p166 re0 november 2017 rough-in drawings cbs-1131 xv+ front cbs-1132 xv+ front cbs-1131 xv+&cbs-1132 xv+ side wiring methods: reference only: see the wiring diagrams at back of this guide cbs-1131 xv...

  • Page 3

    Go to fetco.Com for the latest versions of all information page 3 user guide & operator instructions p166 re0 november 2017 electrical and output specifications for cbs-1131 xv+ single 3 liter 1 gallon-coffee brewers domestic usa and canada cbs-1131 xv+ standard-voltage with cul/ul & nsf-4 certifica...

  • Page 4: ↓

    Go to fetco.Com for the latest versions of all information page 4 user guide & operator instructions p166 re0 november 2017 starting the brew 1. Turn the power switch “on”. (twin shown) 2. Prepare a brew basket with the correct sizefilter and appropriate amount of coffee. 3. Slide the brew basket co...

  • Page 5

    Go to fetco.Com for the latest versions of all information page 5 user guide & operator instructions p166 re0 november 2017 the a menus [a1-3 or a1-6] correspond to batch buttons [3 or 6] on the touch panel access the a menus to program & make changes to individual menu recipes. Menu settings can be...

  • Page 6

    Go to fetco.Com for the latest versions of all information page 6 user guide & operator instructions p166 re0 november 2017 a program menu features: batch parameters the settings below are shown for the top batch on a single brewer top left button on a twin brewer. See how to access all a menus on t...

  • Page 7

    Go to fetco.Com for the latest versions of all information page 7 user guide & operator instructions p166 re0 november 2017 . B general brewer operation control settings, adjust brew flow rate position program items factory set default programming range increments notes b1 tank temp. 93° c -or- 200°...

  • Page 8

    Go to fetco.Com for the latest versions of all information page 8 user guide & operator instructions p166 re0 november 2017 . D outputs test valves and heaters; set screen brightness position program items factory set default programming range increments notes d1 left valve test (press to test) test...

  • Page 9

    Go to fetco.Com for the latest versions of all information page 9 user guide & operator instructions p166 re0 november 2017 f save & exit saving changes and exiting programming the brewer will save changes only from the “f” menu. Do not reboot brewer or toggle on/off-exit as below. To exit programmi...

  • Page 10

    Go to fetco.Com for the latest versions of all information page 10 user guide & operator instructions p166 re0 november 2017 operator training review the operating procedures with whoever will be using the brewer. Pay particular attention to the following areas: 1. Always pre-heat the dispensers bef...

  • Page 11

    Go to fetco.Com for the latest versions of all information page 11 user guide & operator instructions p166 re0 november 2017 installation guide (for qualified service technicians only) general: 1. If not installed correctly by qualified personnel, the brewer will not operate properly and damage may ...

  • Page 12

    Go to fetco.Com for the latest versions of all information page 12 user guide & operator instructions p166 re0 november 2017 brewer setup note-assemble legs after unpacking the brewer and before connection to utilities 1) attach legs for 1 gallon / 3 liter dispensing standard with unit 2-1/2” legs -...

  • Page 13

    Go to fetco.Com for the latest versions of all information page 13 user guide & operator instructions p166 re0 november 2017 installation safety and hygiene directions-for international and ce equipment 1. Access to the service area is restricted to persons having safety/hygiene knowledge and practi...

  • Page 14

    Go to fetco.Com for the latest versions of all information page 14 user guide & operator instructions p166 re0 november 2017 parts diagram cbs-1131xv+ table of variables for cbs-1131xv+ models sku no. Tank assy wiring diagram. Strain relief power cord cord e113151 1104.00082.01 1401.00144.00 1086.00...

  • Page 15

    Go to fetco.Com for the latest versions of all information page 15 user guide & operator instructions p166 re0 november 2017 ref qty part number description drawing 1101.00341.00, cbs-1131xv+ 1 1 1111.00087.00 weldment body, cbs-1131 xv+ 2 1 1057.00043.00 solenoid valve, 5.5l/min, 180 deg, 24vdc 3 2...

  • Page 16

    Go to fetco.Com for the latest versions of all information page 16 user guide & operator instructions p166 re0 november 2017 parts diagrams cbs-1132xv+ table of variables for cbs-1132xv+ models sku no. Tank assy wiring diagram. Strain relief e113251 1104.00057.01 1401.00139.00 1086.00008.00 e113252 ...

  • Page 17

    Go to fetco.Com for the latest versions of all information page 17 user guide & operator instructions p166 re0 november 2017 ref# qty part number description drawing 1101.00340.00 cbs-1132 xv+ 1 1 1111.00085.00 weldment body, cbs-1132 xv+ 2 1 1057.00043.00 solenoid valve, 5.5l/min, 180 deg, 24vdc 3 ...

  • Page 18

    Go to fetco.Com for the latest versions of all information page 18 user guide & operator instructions p166 re0 november 2017 cbs-1131xv+ tank assembly tank assy, cbs-1131 xv+ drawing number 1104.00082.01 ref qty part number description 1 1 1114.00102.00 weldment tank two heaters, grommet 2 2 1024.00...

  • Page 19

    Go to fetco.Com for the latest versions of all information page 19 user guide & operator instructions p166 re0 november 2017 cbs-1132xv+ tank assembly cbs-1132 xv+ hot water tank drawing 1104.00052.01 ref# qty part number description 1 1 1114.00081.00 weldment tank cbs-1132, grommet design 2 2 1024....

  • Page 20

    Go to fetco.Com for the latest versions of all information page 20 user guide & operator instructions p166 re0 november 2017 brew basket parts standard plastic brew basket part number b014218bn2 – complete plastic brew basket cbs-1131 xv+ & cbs-1132xv+ brown colored insert is standard brew basket ha...

  • Page 21

    Go to fetco.Com for the latest versions of all information page 21 user guide & operator instructions p166 re0 november 2017 wiring diagrams table of variables sku sku description: wiring schematic e113151 cbs-1131-xv+, 1ph, 2+g, 2.3kw/120vac, 100-120vac 1401.00051.00 e113153 cbs-1131-xv+, 1ph, 2+g,...

  • Page 22

    Go to fetco.Com for the latest versions of all information page 22 user guide & operator instructions p166 re0 november 2017.

  • Page 23

    Go to fetco.Com for the latest versions of all information page 23 user guide & operator instructions p166 re0 november 2017.

  • Page 24

    Go to fetco.Com for the latest versions of all information page 24 user guide & operator instructions p166 re0 november 2017.

  • Page 25

    End of section notes:.

  • Page 26

    End of section notes:.