Gainsborough e50 Installation Manual

Summary of e50

  • Page 1

    E50 installation guide e50 instructions :layout 1 18/11/14 10:41 page 1.

  • Page 2

    E50 instructions :layout 1 18/11/14 10:41 page 2.

  • Page 3: Contents

    Contents important information 4 - safety information 4 - pipework connections 4 - isolating valves 5 - siting 5 - pressures 5 - pressure relief device 5 components 6 pipework installation 7 electrical installation 8 - mains voltage connection 9 - electrical rating 10 - wiring installation 11 - eart...

  • Page 4: Safety Information

    This installation and user guide is designed to ensure the safety of the installer and user and the operation/reliability of the product. Failure to observe these may cause a hazard, damage the product and invalidate your guarantee. Safety information this product must be installed by a competent pe...

  • Page 5

    5 isolating valves a suitable full bore isolation valve must be fitted to the incoming supply in accordance with the current water supply regulations and our terms of warranty. The isolation valve must be sited in an accessible location for service and maintenance purposes. Siting the unit must be m...

  • Page 6: Components

    Components 6 e50 instructions :layout 1 18/11/14 10:41 page 6.

  • Page 7

    3 remove the fixing screws and lift the casing up and away from the engine assembly. 4 offer the unit onto the finished wall surface in the desired position and mark the three fixing points. Drill and prepare the fixing holes using the fixings provided if suitable. ! In addition to the guide that fo...

  • Page 8: Electrical Installation

    11 turn on the water supply to the shower unit and check for leaks up stream of the shower unit. If all is sound turn off the water supply to the shower unit. ! If required, ensure the water pressure to the shower unit is within the minimum and maximum requirements by following the pressure testing ...

  • Page 9: Mains Voltage Connection

    Switch must be outside zone 2 2.25m 2.25m 0.6m 0.6m 0.6m 0.6m switch must be outside zone 2 ! Mains voltage connection ! Please refer to the typical system diagram shown below. The following notes are for guidance only – the installation must comply with current regulations please ensure you have re...

  • Page 10: Electrical Rating

    2 the shower unit must be connected to its own independent electrical circuit. It must not be connected to a ring main, spur, socket outlet or lighting circuit, otherwise the circuit will overheat. 3 check that the consumer unit (main fuse box): a) has a main switch rating of 80a or above and b) has...

  • Page 11: Wiring Installation

    If upgrading to a higher kw shower it is essential to ensure that the electrical circuit, including the wiring and isolating switches are adequate for the increased load. Notes:- 1. Cable selection is dependant on de-rating factors detailed in the notes below. 2. In certain installations the combina...

  • Page 12: Earth Bonding

    3 place the service tunnel onto the shower unit ensuring it fits flush with the shower unit back plate. 1 prepare two fixing points 598 – 607mm vertically apart using the fixings provided, if suitable. Earth bonding ! The installation must be earth bonded in accordance with current regulations. Wher...

  • Page 13

    3 if required, slide the soap dish onto the rail under the handset holder. 4 fit the rail into the rail end bodies. 5 secure the rail assembly to wall using the fixings provided, if suitable, ensuring the rail and rail end bodies remain firmly engaged. 6 place the rail end caps into the rail ends an...

  • Page 14

    Front cover installation and shower commissioning ! This shower must be fully commissioned following the procedure detailed below before use. Failure to do so could damage the shower and invalidate the guarantee. 1 carefully offer the front casing onto the back plate assembly ensuring the wires are ...

  • Page 15: Handset To Hose Assembly

    Handset to hose assembly 1 ensuring the hose washer is in the correct position, connect the hose to the handset, taking care not to overtighten and place into position within the handset holder. 15 thermal trip the thermal trip cut out will operate with extreme water temperatures. The ‘overheat’ led...

  • Page 16: E50

    E50 - functions key heat setting knob flow/temperature control start/stop button power led overheat led low flow led 16 e50 instructions :layout 1 18/11/14 10:42 page 16.

  • Page 17: E50 User Instructions

    E50 user instructions 1 turn on power to the shower unit. ! Usually a pull cord type isolator switch. ! The power light will illuminate. 2 set the temperature/flow control knob to the full cold position. 3 set the heat setting control knob to the desired position. ! The lower the setting, the cooler...

  • Page 18: E50

    Shower head operation ! Never attempt to make any adjustment to the shower head by pulling on the shower hose. 1 to select the desired spray pattern, rotate the shower spray cassette clockwise or anti-clockwise. 2 to select the preferred height for the shower head, depress the handset holder button ...

  • Page 19: User Guide

    After installation inspection & maintenance in the interest of safety, we recommend this product and its electrical installation are checked by a qualified electrician at least every 2 years. After installation familiarise the end user with the product operation and hand them this guide. Complete an...

  • Page 20: Trouble Shooting Guide

    Trouble shooting guide ! These checks must only be performed by a competent person. Warning! There are no user serviceable components beneath the cover of the appliance. If you are unable to remedy the problem without removing the cover, you should contact your installer or a qualified electrician. ...

  • Page 21

    A ct io n c h e ck is o la to r sw it ch e d o n ,a n d re m a in s o n (p u ll co rd o r w a ll m o u n te d sw it ch ) c h e ck m c b o r fu se a t co n su m e r u n it c h e ck r c d (i f fi tt e d ) r e n e w th e fu se o r re se t m c b /r c d if re q u ir e d if fa u lt p e rs is ts co n ta ct...

  • Page 22

    A ct io n s e e tr o u b le sh o o ti n g p re ss u re s se ct io n f it co rr e ct h o se /h a n d se t r e p la ce d a m a g e d /k in ke d h o se t u rn te m p e ra tu re co n tr o lk n o b a n ti -c lo ck w is e (t o w a rd s co ld ) if so ,d o n o t u s e a ) s w it ch o ff im m e d ia te ly a ...

  • Page 23

    A ct io n c h e ck fl o w ra te /p re ss u re – se e tr o u b le sh o o ti n g p re ss u re s se ct io n n b it is u n li ke ly to a ch ie ve th e re q u ir e m e n ts w it h a h e a d e r ta n k r e p la ce – co n ta ct c u st o m e r s e rv ic e s d e p a rt m e n t r e p la ce . In h a rd w a te ...

  • Page 24

    A ct io n s e e tr o u b le sh o o ti n g p re ss u re s se ct io n s e e tr o u b le sh o o ti n g p re ss u re s se ct io n s h o w e r h a s o v e rh e a te d . T h is is a n o n -u se r se rv ic e a b le p a rt , sh o w e r u n it m u st b e re p la ce d . C o n ta ct c u st o m e r s e rv ic e ...

  • Page 25

    A ct io n r e p la ce . In h a rd w a te r a re a s co n si d e r th e u se o f a w a te r so ft e n e r. C o n ta ct c u st o m e r s e rv ic e s d e p a rt m e n t c o n su lt a q u a li fi e d e le ct ri ci a n c o n ta ct c u st o m e r s e rv ic e s d e p a rt m e n t in cr e a se th e fl o w b...

  • Page 26

    A ct io n f it co rr e ct h o se /h a n d se t r e p la ce d a m a g e d /k in ke d h o se . R e d u ce h e a te r se tt in g c le a n h a n d se t sp ra y p la te - se e cl e a n in g a n d m a in te n a n ce se ct io n s e e tr o u b le sh o o ti n g p re ss u re s se ct io n f it co rr e ct h o s...

  • Page 27

    A ct io n c le a n h a n d se t sp ra y p la te - se e cl e a n in g a n d m a in te n a n ce se ct io n in cr e a se th e fl o w b y tu rn in g th e te m p e ra tu re co n tr o l kn o b in a n a n ti -c lo ck w is e d ir e ct io n (t o w a rd s co ld ) a n d /o r re d u ce th e h e a te r se le ct ...

  • Page 28

    A ct io n e n su re th e co rr e ct su p p li e d h a n d se t is u se d a n d cl e a n fr o m li m e sc a le .E n su re th e h o se is n o t d a m a g e d o r k in ke d . T u rn o ff th e e le ct ri ca l is o la ti n g sw it ch a n d se rv ic e va lv e – co n ta ct c u st o m e r s e rv ic e d e p ...

  • Page 29

    A ct io n f it co rr e ct h o se /h a n d se t c le a n h a n d se t sp ra y p la te - se e cl e a n in g a n d m a in te n a n ce se ct io n r e p la ce – co n ta ct c u st o m e r s e rv ic e s d e p a rt m e n t r e p la ce . In h a rd w a te r a re a s co n si d e r th e u se o f a w a te r so f...

  • Page 30

    A ct io n s e e tr o u b le sh o o ti n g p re ss u re s se ct io n u se a su it a b le d e v ic e to ch e ck th e co n ti n u it y o f th e m ic ro sw it ch o r h e a te r ta n k & re p la ce p a rt s a s n e ce ss a ry – co n ta ct c u st o m e r s e rv ic e s d e p a rt m e n t s y m p to m n o c...

  • Page 31: Approvals

    The gainsborough e50 shower is manufactured in an iso 9001:2000 registered factory and has been designed and tested to the very highest standards. It complies with all relevant international standards for safety and reliability. Approvals 31 e50 instructions :layout 1 18/11/14 10:42 page 31.

  • Page 32

    Gainsborough bathroom products limited the flyer’s way westerham kent tn16 1de customer helpline: 01959 560760 website: www.Gainsboroughshowers.Co.Uk email: enquiries@gainsboroughshowers.Co.Uk part no: 115104 issue 1 nov 14 please note that calls may be recorded for training and quality purposes the...