JBL VTX A12 Rigging Manual - page 38
VTX A12
| Rigging Manual
38
STEPS:
• With the front QRP points set, use the suspension hoist to raise the attached clusters. The second cluster may swing
forward slightly as it lifts off the ground and the cabinets expand to their correct inter-enclosure angles. Ensure that the
Vertical Transporter is completely off the ground and the cluster is able to fully expand before proceeding to the next step.
• When the second cluster is fully expanded, grab the cluster by the rear VT handlebar and gently pull back towards the rear
of the array. While doing this, lower the array so that the front wheels of the Vertical Transporter touch the ground. Keep
lowering the array until the rear attachment points engage with the rear attachment receptacles of the stacked cluster
and the hole for the QRP’s align. Insert the QRP’s and attach the suspended cluster to the stacked cluster.
• Once all four QRP’s have been secured, attach the suspended cluster to the previously stacked cluster. Repeat the steps
above to remove the Vertical Transporter and continue adding speakers to the suspended array.