Le Maitre G300 Operation Manual - page 16
G300 Industrial 20 L. Pail Option
1. Follow these steps for easy setup.
a) Remove cap from 20L pail (this will not be used, so you may want to put
it in a safe place for use later on.), and
remove inner cap if equipped.
b) Examine the end of the hose from your
machine and make sure the filter is in
place and free from obstruction.
c) Now place the hose into the pail’s pour
spout and snap the black fitting into
place.
2. It is now necessary to prime fluid into the sys
tem by following these steps:
a) Set Flow Rate fully clockwise
b) Set duration to 0 sec.
c) Set interval to 0 min.
d) Switch the smoke control to ON
This will produce a pulsing fluid flow which will
prime the machine correctly. Please allow one
minute to ensure proper priming.1
Dry Contact show control terminals have been added to your G300 re mote to
facilitate control through central control system. One set of Normally open contacts
are all that is required.
4. Your custom machine is now ready for regular use.
14
3.