- DL manuals
- Nailor
- Control Unit
- BAC-8001-36
- Installation And Operation Manual
Nailor BAC-8001-36 Installation And Operation Manual - page 19
IOM-EZVAVINST
Date: 10-2016
Supersedes: 7-2016
Nailor reserves the right to change any information concerning product or specification without notice or obligation.
Page 19 of 48
Installation and Operation Manual
●
EZvav Digital Controls
ProceduretosettheTerminalUnitfunctions(continue)
SettheAirflowSetPoints
The airflow set points set the airflow limits for the VAV terminal unit.
• Airflow heating and cooling minimum and maximum limits
• Auxiliary flow set point (optional)
• Minimum and maximum fan speeds (optional)
Setting the airflow set points requires entering Password 2 which is described in the topic Getting started with configuration on
page 14.
Note: If the VAV unit is a heat only or cooling only unit, the airflow set points for the unused mode must be set within the range
of the mode in use. Failure to set the unused set points correctly will result in unpredictable or erroneous air balancing settings.
Tip: Once the following procedure is started, all steps must be completed in order.
Proceduretosettheairflowsetpoints
PROCEDURE
STEPS
STEDISPLAY
7 Set the damper direction to close.
1. Press the
∆
or buttons to which direction to
damper moves to close.
CCW—The actuator turns counterclockwise to close
the damper.
CW—The actuator turns clockwise to close the
damper. (Default)
2. Press the button to save the damper option and
advance to the next function.
8 Select a new configuration
function or exit.
1. Press the
∆
or buttons to select one of the
following:
• STPT, FLOW, ADVC or RSTR options
• BACK to choose another configuration function
• EXIT to return to the temperature display.
2. Press the button to select the next function.
∆
∆
PROCEDURE
STEPS
STEDISPLAY
1 Starting display
1. Start at the temperature display.
2. Press the
∆
and buttons together.
• If Password 2 is not required, the display changes to
CNFG
.
• If required, enter Password 2. The display changes to
CNFG
when Password 2 is correct.
∆
Summary of BAC-8001-36
Page 1
Nailor reserves the right to change any information concerning product or specification without notice or obligation. Iom-ezvavinst date: 10-2016 supersedes: 7-2016 www.Nailor.Com ezvav digital controls.
Page 2: Contents
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 2 of 48 installation and operation manual ● ezvav digital controls contents section 1: about the controllers . . . . . . . . . . ....
Page 3: Contents (Con’T)
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 3 of 48 installation and operation manual ● ezvav digital controls contents (con’t) section7:applicationdrawings . . . . . . . . ....
Page 4
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 4 of 48 installation and operation manual ● ezvav digital controls section 1: about the controllers this section provides a descri...
Page 5
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 5 of 48 installation and operation manual ● ezvav digital controls specifications ezvav specifications are subject to change witho...
Page 6
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 6 of 48 installation and operation manual ● ezvav digital controls actuatorspecifications torque 40 in-lb. (4.5 n.M) angular rotat...
Page 7
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 7 of 48 installation and operation manual ● ezvav digital controls safetyconsiderations nailor assumes the responsibility for prov...
Page 8
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 8 of 48 installation and operation manual ● ezvav digital controls figure2-1 controllerrotationlimitselections to set the rotation...
Page 9
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 9 of 48 installation and operation manual ● ezvav digital controls connectinganairflowsensor an airflow sensor is incorporated as ...
Page 10
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 10 of 48 installation and operation manual ● ezvav digital controls connectingadatsensor the discharge air temperature sensor is r...
Page 11
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 11 of 48 installation and operation manual ● ezvav digital controls section3:installingtheroomsensors an airflow sensor is incorpo...
Page 12
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 12 of 48 installation and operation manual ● ezvav digital controls turncounterclockwiseuntilthe screwsengagethecase. 2. Route the...
Page 13
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 13 of 48 installation and operation manual ● ezvav digital controls section4: changingtheroomsetpoint this section covers topics f...
Page 14
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 14 of 48 installation and operation manual ● ezvav digital controls section5:configuringthecontrollers this topics in this section...
Page 15
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 15 of 48 installation and operation manual ● ezvav digital controls enteringsystemtemperaturesetpointsandlimits the system tempera...
Page 16
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 16 of 48 installation and operation manual ● ezvav digital controls proceduretosetthetemperaturesetpoints(continue) procedure step...
Page 17
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 17 of 48 installation and operation manual ● ezvav digital controls proceduretosetthetemperaturesetpoints(continue) configuringthe...
Page 18
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 18 of 48 installation and operation manual ● ezvav digital controls proceduretosettheterminalunitfunctions(continue) procedure ste...
Page 19
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 19 of 48 installation and operation manual ● ezvav digital controls proceduretosettheterminalunitfunctions(continue) settheairflow...
Page 20
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 20 of 48 installation and operation manual ● ezvav digital controls proceduretosettheairflowsetpoints(continue) procedure steps st...
Page 21
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 21 of 48 installation and operation manual ● ezvav digital controls proceduretosettheairflowsetpoints(continue) advancedoptions th...
Page 22
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 22 of 48 installation and operation manual ● ezvav digital controls proceduretosettheadvancedoptions(continue) procedure steps ste...
Page 23
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 23 of 48 installation and operation manual ● ezvav digital controls proceduretosettheadvancedoptions(continue) restoreapplication ...
Page 24: Section6:balancingairflow
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 24 of 48 installation and operation manual ● ezvav digital controls proceduretorestoreapplication(continue) procedure steps stedis...
Page 25
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 25 of 48 installation and operation manual ● ezvav digital controls theairflowbalancingprocedure procedure steps stedisplay 1 star...
Page 26
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 26 of 48 installation and operation manual ● ezvav digital controls theairflowbalancingprocedure(continue) procedure steps stedisp...
Page 27
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 27 of 48 installation and operation manual ● ezvav digital controls theairflowbalancingprocedure(continue) procedure steps stedisp...
Page 28
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 28 of 48 installation and operation manual ● ezvav digital controls cnfg the main configuration parameters for the vav terminal un...
Page 29
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 29 of 48 installation and operation manual ● ezvav digital controls section7: applicationdrawings this section covers the drawings...
Page 30
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 30 of 48 installation and operation manual ● ezvav digital controls stagedreheat this application is for bac 8005-36 controller. T...
Page 31
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 31 of 48 installation and operation manual ● ezvav digital controls modulatingreheat this application is for a bac-8005-36 control...
Page 32
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 32 of 48 installation and operation manual ● ezvav digital controls floatingreheat this application is for a bac-8005-36 controlle...
Page 33
Ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 33 of 48 installation and operation manual ● ezvav digital controls dualductapplication this application is for a bac-8007-36 controll...
Page 34: Section8:sequenceofoperation
Ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 34 of 48 installation and operation manual ● ezvav digital controls section8:sequenceofoperation topics in this section cover the sequ...
Page 35
Ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 35 of 48 installation and operation manual ● ezvav digital controls occupancysequence an ezvav controller is designed to operate as a ...
Page 36
Ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 36 of 48 installation and operation manual ● ezvav digital controls unoccupied set point — a temperature set point entered by the cont...
Page 37
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 37 of 48 installation and operation manual ● ezvav digital controls dischargeairtemperature(dat)limiting to utilize discharge air ...
Page 38
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 38 of 48 installation and operation manual ● ezvav digital controls damperoperation damper movement is determined by comparing the...
Page 39
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 39 of 48 installation and operation manual ● ezvav digital controls reheatsequence the ezvav controllers can control three types o...
Page 40
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 40 of 48 installation and operation manual ● ezvav digital controls floatingreheat if the controller is configured for floating re...
Page 41
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 41 of 48 installation and operation manual ● ezvav digital controls figure8-6 dualductsequence section9:systemintegrationandnetwor...
Page 42
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 42 of 48 installation and operation manual ● ezvav digital controls connectionsandwiring use the following principles when connect...
Page 43
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 43 of 48 installation and operation manual ● ezvav digital controls proceduretosetupnetworkcommunications(continue) procedure step...
Page 44
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 44 of 48 installation and operation manual ● ezvav digital controls bacnet objects the ezvav controllers are bacnet application sp...
Page 45
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 45 of 48 installation and operation manual ● ezvav digital controls table 9–4 analog value objects (continue) object name descript...
Page 46
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 46 of 48 installation and operation manual ● ezvav digital controls table9–5 binaryvalueobjects object name description bv1 need a...
Page 47
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 47 of 48 installation and operation manual ● ezvav digital controls diamondflowsensork-factorsforvavterminalunits model series: 30...
Page 48
Iom-ezvavinst date: 10-2016 supersedes: 7-2016 nailor reserves the right to change any information concerning product or specification without notice or obligation. Page 48 of 48 installation and operation manual ● ezvav digital controls for additional information regarding the content of the materi...