Oasis P1PV Installation & Service Instructions Manual - page 4
P1PV / P1PVCD Series
Installation & Service Instructions
030099-347 Rev. 2
pg 4 of 16
© Copyright 2007 OASIS Corporation
Self-Drain Drip Tray:
•
The drip tray supplied with the P1PV coolers is fitted with a self-drain facility. To put the self-
drain facility into service, follow the instructions listed below:
o
Remove the drip tray from the cooler
o
Remove the grille from the drip tray
o
Using a 8mm (5/16”) diameter drill, drill a hole through the bottom of the drip tray stem
o
Fit a flexible hose of 10mm (or 3/8”) inner diameter onto the stem
o
Route the hose through the partition to the rear of the unit – you can run this hose directly
to a main water drain or connect it to a storage vessel that will need to be emptied at
regular intervals
Water Pipe and Fittings:
•
All water connection fittings are made by the John Guest Company and are approved to NSF
standards 51 and 61. The machine is connected to the water supply by a ¼” female bulkhead
fitting.
•
The entire internal water circuit and all the components which come in contact with water are
food grade NSF / WRAS approved
Mounting Feet
•
The unit is supplied with 4 mounting feet (packed inside the filter compartment). These can be
used to level the cooler on uneven surfaces. To install the feet, simply screw them into the 4
threaded holes in the metal base of the cooler
Water Valves:
•
Control of water dispensing is achieved by means of mains AC electrical solenoid valves.
Three valves are used – two for cold water and one for ambient or hot water (depending on
model). The valves remain open when the customer pushes the dispense button for a drink
Panels:
•
All external molded panels are made from ABS plastic. The material used is UV resistant and
meets all CE and UL requirements for fire safety. All metal panels are made from galvanized
steel which is then painted. The galvanized coating provides increased resistance to rust and
corrosion.