Quooker PRO3-VAQ E Installation Manual - page 5
Other manuals for PRO3-VAQ E:
Installation Manual, Installation Manual
Manual is about: boiler for supply of water
of
16
It is recommended that you install the Quooker in the following order:
A. Drilling hole
B1. Fitting Nordic tap
C. Connecting water
D. Connecting waste
E1. Connecting tank with Nordic tap
NOTE: Bear in mind that the tank, inlet combination, mixing valve and socket
must remain accessible for servicing.
For an overview of the Fusion tap installation, please refer to the next page.
Overview of Nordic tap installation