Quooker PRO3-VAQ E Installation Manual - page 6
Other manuals for PRO3-VAQ E:
Installation Manual, Installation Manual
Manual is about: boiler for supply of water
of
16
It is recommended that you install the Quooker in the following order:
A. Drilling hole
B2. Fitting Fusion tap
C. Connecting water
D. Connecting waste
E2. Connecting tank with Fusion tap
NOTE: Bear in mind that the tank, inlet combination, mixing valve and socket
must remain accessible for servicing.
Overview of Fusion tap installation