RAB AL Installation Instructions - page 3
AL
TM
AREA LIGHT INSTALLATION INSTRUCTIONS
®
Page
MOUNTING (1) AL fIXTURE TO
BTA ADAPTOR
Fixed Arm mounting to RAB’s pole top adaptor,
Loosen (4) door screws, open fixture. Remove
ballast cover.
Insert
Threaded Rods into the Adaptor.
Feed wires from fixture through
Gasket, Arm and
2nd
Gasket and into Adaptor. Make connections
and push wires into the adaptor. Wires should be
knotted as a strain relief.
Line up extrusion slots with the
Threaded Rods
and slide
Arm and fixture on Threaded Rods.
Place flat washer, lock washer and nuts on
each
Threaded Rod inside the fixture. Tighten
securely.
Place
Adaptor over 2 /8” Tenon and tighten set
screws on
Adaptor.
1.
2.
3.
4.
5.
6.
Adaptor
Gaskets(2)
Arm
Threaded
Rods(2)
MOUNTING (2) AL fIXTURES AT
180° TO BTA ADAPTOR
Fixed Arm mounting to BTA180 for mounting 2 fixtures at
180 degrees as shown below.
See steps 1-6 in
“MOUNTING () AL FIXTURE TO BTA
ADAPTOR” section. Follow for each fixture.
MOUNTING (2) AL fIXTURES AT
90° TO BTA ADAPTOR
Fixed Arm mounting to BTA90 for mounting 2 fixtures at
90 degrees as shown below.
See steps 1-6 in
“MOUNTING () AL FIXTURE TO BTA
ADAPTOR” section. Follow for each fixture.
MOUNTING (3) AL fIXTURES TO
BTA ADAPTOR
Fixed Arm mounting to BTA3 for mounting 3 fixtures as
shown below.
See steps 1-6 in
“MOUNTING () AL FIXTURE TO BTA
ADAPTOR” section. Follow for each fixture.
MOUNTING (4) AL fIXTURES TO
BTA ADAPTOR
Fixed Arm mounting to BTA4 for mounting 4 fixtures as
shown below.
See steps 1-6 in
“MOUNTING () AL FIXTURE TO BTA
ADAPTOR” section. Follow for each fixture.