Rapid Engineering CGTH-30 Installation & operation manual - page 30
Manual is about: Gas-Fired, Low-Intensity Infrared
Heaters for Light Industrial/
Commercial Applications
of
64
CGTH I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
24 of 55
FIGURE 13: Horizontal Installation
8
.12 45° Tilted Installation
For tilted installations:
1. Determine if the heater is going to
b
e tilted left or
tilted right.
. Select the
s
u
spension point for left or right tilting. T
w
o s
u
s-
pension points m
u
st
b
e
u
sed for the front
hanger.
2. The
u
ppermost snap hook can no
w
b
e installed
on the s
u
spension hard
w
are that yo
u
ha
v
e
installed for s
u
spension of the
u
nit. An addi-
tional length of chain may also no
w
b
e installed,
if req
u
ired, to lo
w
er the heater.
FIGURE 14: 45° Tilted Installation
Fr
o
n
t
Fixed Han
g
er
R
ear M
ov
a
b
le Han
g
er
Snap H
oo
k
s
T
ilted Right
Us
e
both
sus
pen
s
i
o
n
p
o
in
ts
fo
r in
st
alla
t
i
o
n
T
ilted Left
Snap H
oo
k
s