Raychem h910 Installation Instructions Manual - page 4
H910 Installation Instructions
Place edge of
tube at edge
of mastic
Approx.
4-1/2"
6" tube
• Position the 6”-long heat-
shrinkable tube as shown.
14
1/4"
• Twist the braid
pigtails together.
• Slide uninsulated crimp over
braid to within 1/4” of heating
cable as shown.
• Crimp the braid, using the
Ideal crimp tool.
• Cut off the extra braid.
10
Black tape
• Fold the crimped braid back
against the heating cables.
• Wrap black cloth tape
evenly around crimp and
heating cables. Cover crimp
completely.
• Select one bus wire from
each cable section and
twist the wires
together.
• Repeat with remaining
bus wires.
Be careful not to twist
together bus wires from
the same heating cable.
• Use insulated bus wire
crimps and T&B crimp
tool to crimp each set of
bus wires together.
• Slide heat-shrinkable cap over bus
wire crimps.
• It is not necessary to shrink cap.
11
13
12