T&C TC42 Installation Instructions Manual - page 11
11
TC42.NG06C 020511-16
LP GAS/
DU GAZ LP
12.5 in/wc /12.5 po/c.e.
(3.11 kPa)
13.9 in/wc / 13.9 po/c.e.
(3.45 kPa)
11.0 in/wc / 11.0 po/c.e.
(.95 kPa)
3/32” (2.38 mm)
Max.: 61,000 (17.9)
Min.: 46,200 (13.5)
260411 6-TC42C 5052.5206C
Date: ______________________
By / Par: ___________________
Kit # TC42.LPKTB/EB/EC for use with model:
Pour utilise avec du modèle:
This appliance was converted
to PROPANE GAS with this
kit on this date by the or-
ganization which accepts the
responsibility that this conver-
sion has been properly made.
/ Cet appariel etair converter
au gaz LP par l’emploi de la
trousse de conversion par une
organization qui accepte la
responsibilité pour une instal-
lation en bon état.
TC42
Series C
NG
LP
Fig #24
Fig #25
Fig #23
Minimum
rate screw
Fig #22
Fig #24a
ADD NAME
Minimum
ate screw
10.
Replace the minimum rate screw with the
one provided in the propane conversion
kit supplied with this fi replace. Ensure
that the screw is fully installed.
(Fig.
#22)
11.
Pull off the aluminum cap from the top
of the pressure regulator. (Fig. #23)
12. Press down on the center post and
rotate 90°. The center post should
stay down. (Fig. #24). Replace the
aluminum
cap.
13.
Fill in the date and the name of the
person who performed the conversion in
the white area on the conversion label.
Peel off the protective backing and apply
the conversion label directly over the
gas specifi cations on the rating label.
14.
Attach the access panel to the side of
the fi rebox with the previously removed
screws. (Fig. #25)
Note:
Gasket must be installed with access
panel.
ADD DATE