Tait TB7100 Installation Manual - 1.8
10
Installation
TB7100 Installation Guide
© Tait Electronics Limited May 2005
1.8
Installing the Base Station
1.8.1
Unpacking the Equipment
Unpacking the
TB7100 Base Station
The TB7100 base station is packed in a strong corrugated cardboard carton
with top and bottom foam cushions.
1.
Cut the tape securing the flaps at the top of the carton and fold them
flat against the sides.
2.
Rotate the carton carefully onto its side and then onto its top,
ensuring that none of the flaps is trapped underneath.
3.
Slide the carton upwards over the foam cushions and lift it away.
Remove the cushion from the bottom of the base station.
4.
Lift the base station clear of the remaining cushion.
Disposal of
Packaging
If you do not need to keep the packaging, we recommend that you recycle
it according to your local recycling methods. The foam cushions are CFC-
and HCFC-free and may be burnt in a suitable waste-to-energy combustion
facility, or compacted in landfill.
1.8.2
Mounting the base station
1.
Fit the base station into the cabinet or rack and secure it firmly with
an M6 (or 0.25in if you are using imperial fittings) screw, flat and
spring washer in each of the four main mounting holes
b
, as shown
in
Figure 1.3 on page 11
.
2.
The TB7100 base station can be wall mounted by rotating the front
mounting brackets and fitting the optional rear brackets (TBBA03-
01). When the TB7100 base station is wall mounted ensure the
airflow is from bottom to top (front panel mounted down) or side to
side.
3.
For transport or in installations subject to vibration the TB7100
should be supported at the rear using a transit bracket. (recommended
part 302-05282-00 - TB7100 Transit Bracket)