Tayana TAYANA-48 Owner's Manual - Builder
Maxwell Winches Installation Inspection Form
C)
Control Equipment
Port Windlass
STBD Windlass
Port Capstan
STBD Capstan
1)
Voltage / Frequency
2)
AC controller
3)
Power down control
4)
Solenoid control box
V
5)
Controls installed in dry location
V
6)
Wired correctly
V
7)
Breaker isolator
135AMP
8)
Isolator correctly located
V
9)
Control circuit fuse fitted
V
10)
Control fuse accessible and dry
V
11)
Motor cables correctly sized
V
12)
Control cables correctly sized
V
13)
Battery voltage at supply
13.69V
14)
Voltage at winch motorwhile running
11.82V
15)
Hydraulic pressure
16)
Hydraulic flow
17)
Hydraulic hose size
18)
Comments and Recommendations
D)
General
1)
Mounting bolts greased and tightened
V
2)
Electrical terminals all tight
V
3)
Electrical terminals protectively coated
V
4)
Cover / protection of windlass
V
5)
Windlass operating correctly
V
6)
Chrome plating to standard
V
7)
Clutch handle
V
8)
Owners manual on vessel
V
9)
Cover/protection for winch shipping
V
10)
Comments and Recommendations
Singned by :
KEVIN LIU
Singned by :
Mercury Marine Supply Co., Ltd
Builder
Page 2/2