Valet V100 Installation & Operation Manual - page 12
Manual is about: Premium Cyclonic Central Vacuum Systems
of
16
emptying the dust container
Before any maintenance job, turn off
the mains power at the power point.
regular maintenance increases
the life span of the power unit and
ensures maximum performance.
regularly check the system for leaks
or blockages.
1
. remove the dust container.
3
. empty the dust container.
2
. lift out the dust cone.
4
. replace the cone ensuring it is pointing
downwards and reassemble the dust
container paying attention to the seal
position.
do not operate the power unit
without a filter cartridge. not
observing this precaution may
result in serious damage to
the motor and will void the
manufacturer’s warranty.
please wear a dust mask and
gloves
12