Venmar CPM SERIES Installation Instructions Manual - 13. Install Power Pack
9
13. INSTALL POWER PACK
CAUTION
Take care not to kink ducting when installing the power pack.
Using provided no. 8 x 1/2” chrome plated screws, install the power pack inside the
custom hood. Start with 2 screws on front corners, then use 4 screws for sides and
use the remaining ones to finalize securing the front power pack. (See figure at right
for mounting screw specific locations.)
Make sure the adapter/damper (or the adapter) enters the ducting. When there is
access to the top of the power pack, seal connections with metal foil duct tape.
14. REINSTALL BLOWER(S)
HH0102A
CPM1 M
ODELS
HD0293
Slide the blower to engage its flange in the
retaining bracket.
HD0269
L
EFT
SIDE
MOUNTING
SCREW
LOCATIONS
Using a 5/16” socket, secure the blower to the
inner top of the power pack with all blower
mounting screws (previously removed in step 12).
HD0282
R
IGHT
SIDE
MOUNTING
SCREW
LOCATION
For each blower, slide it to engage its flanges in both retaining brackets.
NOTE: Both blowers are identical and can be mounted on either side of the power pack.
CPM2 M
ODELS
For each blower, using a 5/16” socket, secure the blower to the inner top of the power pack through
the front and rear brackets with all blower mounting screws (previously removed in step 12).
HD0298
B
LOWERS
FRONT
BRACKET
B
LOWERS
REAR
BRACKET
HD0297