Summary of EUROLINE

  • Page 1

    Page 1 l158 0311a ul c us r read and save these instructions all hoods must be installed by a qualified installer installation instructions euroline wall mount hood with k series blower read all instructions thoroughly before beginning installation warning - to reduce the risk of fire, electric shoc...

  • Page 2: Ducting Do’S and Don’Ts

    Page 2 l158 0311a ducting do’s and don’ts never restrict the duct size. The k250 blower unit requires 7” round duct or equivalent (38.5 square inches). Using vent-a-hood transitions (back page) will ensure proper efficiency. Blower duct size sq. Inch area vent-a-hood transition k250 7” round or equi...

  • Page 3: Installation Details

    Page 3 l158 0311a 7" round installation details 1) read all instructions thoroughly before beginning installation. Note: these instructions apply to standard hoods only. Custom hoods may require additional specification consideration. 2) when installing a 14” tall euroline wall mount range hood, it ...

  • Page 4

    Page 4 l158 0311a installation details continued 4) remove the hood from its packaging and place the back of the hood on the floor or countertop in front of the wall where it will hang. 5) remove the duct cover from its packaging. Remove the duct cover mounting screws from the top of the hood. Place...

  • Page 5: Venting

    Page 5 l158 0311a venting accessories wall louver 6” 7” 8” 8 5⁄8” back view 1 ½” flange wall louver 11” 11” back view 1 ½” flange wall louver 13” 13” back view 1 ½” flange rectangular wall louver 3 ¼” 10” 8 ½” 6” 1 ½” flange 2” flange low profile roof jack (maximum 4/12 pitch) 6 ½” 16 ¾” 16 ¾” low p...