Vents VUE2 200 P User manual

Manual is about: Heat (energy / heat and energy) recovery air handling unit

Summary of VUE2 200 P

  • Page 1

    User’s manual vut2 200 p vue2 200 p vute2 200 p heat (energy / heat and energy) recovery air handling unit.

  • Page 2

    Www.Ventilation-system.Com 2 introduction................................................................................................................ 3 purpose......................................................................................................................... 5 delivery set....

  • Page 3

    3 • read the user’s manual carefully prior to installing and operating the unit. • fulfi l the user’s manual requirements as well as the provisions of all the applicable local and national construction, electrical and technical norms and standards. • the warnings contained in the user’s manual must ...

  • Page 4

    Www.Ventilation-system.Com 4 unit mounting and operation safety precautions • do not allow children to operate the unit. • disconnect the unit from power mains prior to any technical maintenance. • do not store any explosive or highly fl ammable substances in close proximity to the unit. • when the ...

  • Page 5: Vu_2 200 P

    5 due to the ability to save heating energy by means of energy recovery the unit is an important element of energy-effi cient premises. The unit is a component part and is not designed for independent operation. The unit is designed to provide permanent controlled air exchange by means of mechanical...

  • Page 6

    Www.Ventilation-system.Com 6 technical data the unit is designed for indoor application with the ambient temperature ranging from +1 °c up to +50 °c and relative humidity up to 80 %. Hazardous parts access and water ingress protection rating: • ip 44 for the unit motors; • ip 22 for the assembled un...

  • Page 7

    7 unit design and operating logic the unit has the following operating logic: warm stale extract air from the room fl ows to the unit, where it is fi ltered, then air fl ows through the heat exchangers and is exhausted outside by the extract fan. Clean cold air from outside is moved to the supply fi...

  • Page 8

    Www.Ventilation-system.Com 8 mounting and set-up unit mounting the unit must be mounted by a qualified expert only, properly trained and having the required tools and materials. Distance to the unit when selecting the installation site provide minimum allowed distances to the unit. Min 50 mm min 200...

  • Page 9

    9 loosen the three-sided thumbscrews. Set the unit thumbscrews into the mating cutouts in the mounting brackets as it is fi gured below. Then tighten the three-sided thumbscrews to fi x the unit. Mounting using belts the unit is suspended with the belts which must be selected to match the unit weigh...

  • Page 10

    Www.Ventilation-system.Com 10 condensate drainage the unit is equipped with drain pans designed to remove condensate formed in the process of heat exchangers operation. Connect the drain pipes, the u-traps and the sewage system with plastic or rubber pipes for condensate disposal arrangement. The pi...

  • Page 11

    11 connection to power mains disconnect the unit from power mains prior to any operations. The unit must be connected to power mains by a qualified electrician. The rated electrical parameters of the unit are given on the manufacturer’s label. The unit is rated for connection to single-phase ac 230 ...

  • Page 12

    Www.Ventilation-system.Com 12 unit control the unit is operated via the three-position switch allowing to set one of three operating modes: low speed (low), medium speed (med) or standby mode (stand by), which gives complete control over the air quality. Up to 5 external controls can be connected to...

  • Page 13

    13 1. Ac208em2 (24vac) control panel (digital thermostat). The aac208em2 (24vac) control panel (digital thermostat) provides: • switching the air handling unit on/off. • selecting one of 3 speed modes. • display of room temperature. • scheduled operation. 2. P3-1-300 speed switch. The p3-1-300 rotar...

  • Page 14

    Www.Ventilation-system.Com 14 technical maintenance disconnect the unit from power mains prior to any maintenance operations. Maintenance operations of the unit are required 3-4 times per year. Maintenance includes general cleaning of the unit and the following operations: 1. Filter maintenance (3-4...

  • Page 15

    15 problem possible reasons troubleshooting the fan(s) do(es) not start. No power supply. Make sure the power supply line is connected correctly, other- wise troubleshoot a connection error. Cold supply air extract fi lter clogging. Clean or replace the extract fi lter. The heat exchanger is frosted...

  • Page 16

    Www.Ventilation-system.Com 16 manufacturer’s warranty following the regulations stipulated herein will ensure a long and trouble-free operation of the unit. Users’ warranty claims shall be subject to review only upon presentation of the unit, the payment document and the user’s manual with the purch...

  • Page 17

    17 seller address phone number e-mail purchase date seller’s stamp unit type heat (energy / heat and energy) recovery air handling unit model vu____2 200 p serial number manufacture date «we hereby declare that the product complies with the essential protection requirements of electromagnetic counci...

  • Page 18

    V87en-03.