Verine Carmelo 1150 NHWV00RN NG Installation, User And Servicing Instructions - page 8
Page 8 of 14
into the rear and bottom of the lower firebox.
7
Slide the firebox into the opening. If a decorative infill panel is going to be used and
is not yet in place make sure that the firebox flange clears the front face of the fire
opening by the thickness of the infill panel. Ensure that the flue opening is
unobstructed and gives a clear passage for the products of combustion to the flue.
The firebox can now be fixed in position using screws and wall plugs to the hearth
and rear wall of the fire opening through the slotted holes in the bottom and rear of
the lower part of the firebox. Do not fully tighten these screws at this time.
8
At this point the installation may be easier if the top part of the firebox is removed
from the bottom to give better access to install the gas supply.
9
Temporarily place the control mount in the lower part of the firebox and run the gas
supply through one of the grommeted holes at the rear or bottom of the lower firebox
and connect it to the gas inlet fitting. This fitting accepts 8mm diameter tubing.
Prior in connecting the gas supply to the appliance it is important to blow out the
supply pipe to clear any of the debris that may be present and which could cause a
blockage in the control valve or pilot. Provision will have to be made to pass the pipe
through the masonry of the fireplace. Care must be taken to sleeve the supply pipe
when passing through the masonry. Exposed pipe within the fire opening should be
wrapped, painted with bituminous paint or factory sheathed. Disconnect the gas
supply and remove the control mount.
10
The space in front of the lower part of the firebox can be filled with masonry and
made good or an infill panel fitted. Slide the upper part of the firebox into position
and fix to the lower part with eight plain self tapping screws.
11
Replace the control mount in position making sure that the holes locate over the
studs in the base of the firebox. As the control mount is lifted into position the lead
from the power supply unit should be plugged into the electronic box under the
control mount. the socket for the 6v DC supply is located on the side of the control
next to the gas control valve. Re-connect the gas supply and plug the lead from the
power supply unit into the mains.
12
Replace the heat shield. Place the burner in position ensuring that the mixing tube
locates in its hole in the burner mount over the injector. Carefully place the infill
grill in position with the locating tabs engaging with the slots in the front lower part
of the firebox and fix in place at the back of the box with the four self tapping screws
provided. Since the infill grill locates and secures the main burner, the burner
position may have to be adjusted slightly before the grill will lay flat.
13
Gas Soundness Check
Once the gas supply is connected, all joints must be checked for gas soundness.
Note: It is permissible to light the fire
FOR SHORT PERIODS ONLY when the
burner has not been filled with the loose infill. It is easier to perform these checks if
the burner is temporarily placed in position without re-placing the grill and heat
shield as the tube from the manometer can pass in front of the burner. Please note
that the flames from the burner ports will not all be of equal length.