Wacker Neuson BTS 1030 Operator's Manual - Service
T00823GB
33
MAINTENANCE
CAUTION:
Before doing any work on the Power Cut turn off
the engine, remove the cutting disc, pull the plug
cap off the spark plug and wear protective gloves!
CAUTION:
Start the Power Cut only after complete assembly
and inspection.
IMPORTANT:
Because many of the parts and assemblies not
mentioned in this Instruction Manual are vital to
the safety of the unit, and because all parts are
subject to a certain amount of wear and tear, it is
important for your own safety that you have the
unit checked and maintained regularly by a
WACKER service station.
IMPORTANT:
If the cutting wheel breaks during cutting,
the Power Cut must be repaired by a
WACKER service station before being
used again!
Changing the V-belt
Loosen nuts (3).
Loosen the tightening screw (1) (counter-clockwise)
until the end of the screw (2) is visible in the gap.
Unscrew the nuts (3) and remove the cover (4).
Remove the screws (5) and (7) and remove the side
piece (6).
NOTE:
Screw (5) is longer than screws (7). Make
sure to put them back in the right places
during reassembly!
Unscrew screws (8) and remove the crankcase
housing cover (9).
Remove the old belt (10) or belt pieces. Clean out the
inside of the drive arm with a brush.
Put in a new V-belt.
NOTE:
Reassemble the crankcase housing cover (9), side
piece (53/6) and cover (53/4) in the reverse order.
To tighten the V-belt see “Tightening the V-belt /
Checking V-belt tension“.
51
52
SERVICE
53
54