Wacker Neuson EH 25 Operator's Manual - page 25
Manual is about: Wacker Neuson EH Electric hammer Operator's manual
of
54
8 Transport
25
8
Transport
Performing preparations
1. Pull the plug from the plug receptacle.
2. Let machine cool off.
3. Remove tool.
4. Wind up the power cable.
Transporting the machine
5. Lift machine with the supplementary handle.
6. Place the machine on or into a suitable transport vehicle.
7. Secure the machine against falling over and down or sliding.
Note:
Wacker Neuson recommends to use the truck for the transport on the
construction site, refer to chapter Accessories.
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety information of this operator's manual, see chapter
Safety.