10 Maintenance
32
10.2
Maintenance schedule
10.3
Maintenance work
Task
Daily
before
operation
Every
20 hrs.
Monthly
Check power cable for perfect
condition – if power cable is
defective, have it replaced. *
* Have these tasks carried out by the service department of your Wacker
Neuson contact person.
Visual inspection of all parts
for damage.
Clean the machine.
Ventilation slots.
Check the tool end and
cutting edge – if required,
sharpen, reforge or replace
(have it replaced).
Lubricate the machine.
Check tool holder for wear –
have it changed, if
necessary. *