Wayne HSG200 Manual - page 2
SPECIFICATIONS MODELS
HSG200, HSG400
NATURAL OR PROPANE GAS
NOTE: Dimensions in ( ) are informational only. English values take priority.
HSG200
Maximum Input Capacity - 200 MBtu/HR (211000 kJ)
Minimum Input Capacity - 60 MBtu/HR (63300 kJ)
HSG400
Maximum Input Capacity - 400 MBtu/HR (422000 kJ)
Minimum Input Capacity - 200 MBtu/HR (211000 kJ)
SUPPLY LINE PRESSURE REQUIRED: Natural or Propane 5.5 W.C. (1370 Pa) Minimum, 14.0 W.C. (3487 Pa)
Maximum
AIR TUBE DIAMETER: 4 inches (101.6 mm)
AIR TUBE LENGTHS:
HSG200
6 inches
(152.4 mm)
(See Fig. 12C for
HSG400
6.25 inches
(158.75 mm)
Overall Dimensions)
HSG200/400
9.00 inches
(228.6 mm)
HSG200/400
12.00 inches
(304.8 mm)
MOUNTING: Adjustable flange standard (deduct 1 1/8 inch (28.575 mm) from above air tube lengths when using
flange). Optional pedestal mounting.
STANDARD VOLTAGE:
120 VAC / 60 HZ/ 1 Phase
120 VAC / 50 HZ/ 1 Phase (Special motor installed with max capacity reduced 20%)
220 VAC / 50 HZ/ 1 Phase
FLAME SAFETY: 24 VAC Electronic
IGNITION: 7300 VAC Direct Spark
GAS VALVE: 3/4 x 3/4 (19.05 mm x 19.05 mm) NPT 3 Function Redundant 24 VAC
*200 MBtu/HR (211000 kJ) (200,000 BTU [58.62 kW] / HR) or 400 MBtu/HR (42200 kJ) (400,000 BTU [117.24 kW]
/ HR) at sea level. Derate input for altitude over 2000 ft. (609.6 m) by 4% each 1000 ft. (304.8 m) above sea level.
(one gallon (3.79 L) fuel oil = 140 MBtu/HR (14770 kJ)).
CONTENTS
PAGE
SECTION I INSTALLATION .........................................................................................................................................1
A. GENERAL .........................................................................................................................................................2
B. VENTILATION ...................................................................................................................................................2
C. HEATING APPLIANCE INSPECTION ..............................................................................................................2
D. CHIMNEY, FLUE PIPE AND DRAFT CONTROL ..........................................................................................2-3
E. COMBUSTION CHAMBER ...............................................................................................................................4
F. GAS PIPING ......................................................................................................................................................4
G. ELECTRICAL....................................................................................................................................................5
H. MAIN BURNER ORIFICE SIZING AND INSTALLATION .................................................................................5
I. COMBUSTION GAS VALVE...............................................................................................................................6
SECTION II INITIAL START UP................................................................................................................................7-8
SECTION III OPERATION AND TROUBLESHOOTING.........................................................................................9-14
SECTION IV SERVICE ..........................................................................................................................................15-16
PARTS LISTS .............................................................................................................................................................17
EXPLODED VIEW ......................................................................................................................................................18
TECHNICAL INFORMATION......................................................................................................................................19
WARRANTY................................................................................................................................................................20
CONSUMER INSTRUCTIONS ...................................................................................................................................21