XPS Concrete Genie Manual - page 11
9
Adjust the handle position (for 2T series)
1.
Pull handle adjuster as picture (8), adjust handle to suitable position and release handle adjuster, the handle will be locked up as picture (9)
2.
Grip handle to operate machine
Water Controller
1.
Ensure water controller is off before water injection as picture (10), counterclockwise rotation is off, clockwise rotation is opening the water
controller
2.
Input water as picture (11)
3.
Adjust the water amount according to operation requirements
Warning
Before motor starts, do prepare control of the machine, after start the machine, move the machine back and forth or right and left to
avoid damaging the floor
Note
1.
During operation, be careful of the pads wearing condition to change pads in time if the pads wearing out.
2.
Take off the weight iron if grinding soft surface otherwise will speed up the wearing pads
3.
After operation, remove convertible adaptors and keep in fry place to avoid damage
Change the diamond pad
Tip over the machine as picture (3), and (4)
pic (8)
pic (11)
pic (9)
pic (10)
pic (3)
Manual - Concrete Genie
Pad holder rotation
pic (6)
Change the diamond pad
Change diamond pads
pic (5)
Multi-functional under prop
pic (7)
Move the machine
Insert lever sheath, adjust handle to
horizontal position, and lift machine.
pic (2)
pic (3)