Yale SHAW-BOX Operation & Service Manual - Installation
4
Installation
03.2018
27
ba
-o
.2
.6
.0
-us
-1.
1-
y
|
A
11
86
75
01
R
ev
A
A
4.3.4
Monorail trolley (UE-S4)
with YKB/SKB, YKC/SKC, 1PS wire rope hoists (single fall)
Fig. 17
Ø D Trolley
c
f/2
x
y
z
max
Tightening
torque
[in]
INP IPE IPB
"
[in]
[lb
f
ft]
3.9 UE-S4
B = 3.5…19.7
in
B+2.6
1)
0.059 3
5.6 1.12
155
Tab. 10
1)
for INP beam: -0.079 in.
1.
Check flange width
“B”
and clearance
c ±0.079 in
. against Tab. 10 and set trolley to
beam width if necessary. Ensure that the connection piece (square tube) (6) is in the
center (of dimension
“c”
) between the trolley side cheeks (
z1 = z2
).
2.
After unscrewing nuts (3) together with nuts (2), adjust clearance
c ±0.079 in
. and
tighten nuts (3).
3.
Tighten nuts with torque spanner to the specified tightening torques (see table
above).
4.
Clearance
“c”
results in a flange play of
f/2 +0.039 in.
on each side. If necessary,
correct flange play by means of clearance
“c”
.
Installation if end of runway is freely accessible
1.
Slide trolley onto end of runway and check play
f/2
.
Installation if end of runway is not accessible
1.
Loosen nuts (3) on threaded bolts (1) in the square tube of the trolley side cheeks (4)
and unscrew by dimension
“x”
.
2.
Push trolley side cheeks (4) apart in parallel up to the unscrewed nuts (3) until
dimension
B+y
or
c+x
is reached.
3.
Slide trolley onto the bottom flange of the runway beam on the axle keep plate side
(8) and secure against shifting.
4.
Push trolley side cheeks (4) back to nuts (2), retighten nuts (3).
5.
Check track gage
c ±0.079 in
. and play of guide rollers
f/2
.
6.
Tighten nuts with torque spanner to the specified tightening torques (see table
above).