Yale SHAW-BOX Operation & Service Manual - Installation
4
Installation
32
03.2018
ba
-o
.2
.6
.0
-us
-1.
1-
y
|
A
11
86
75
01
R
ev
A
A
Installation if end of runway is not accessible
1.
Loosen nuts (3) on threaded bolts (1) in the square tube of the trolley side cheeks (4)
and unscrew by dimension
“x”
.
2.
Push trolley side cheeks (4) apart in parallel up to the unscrewed nuts (3) until
dimension
B+y
or
c+x
is reached, and lift trolley onto runway from below.
3.
Lift trolley onto runway from below.
4.
Slide trolley onto the bottom flange of the runway beam on the hoist side and secure
against shifting.
5.
Push trolley side cheeks (4) back to nuts (2), retighten nuts (3).
6.
Check track gage
“c”
and play of guide rollers
f/2
.
7.
Tighten nuts (3) with a torque spanner to the specified tightening torque (see table
above).
Centering bogie
1.
Loosen nuts (5) and shift bogie (6) on connecting bolt (7).
2.
Dimension
“z”
between trolley side cheeks (4) and bogie (6) is equal on both sides.
3.
Tighten nuts (5) with a torque spanner to the specified tightening torque (see table
above).