3onedata IES7110-2GS-P User manual - page 4
port is transmit side, must connect to RX (receive side). The fiber
interface support loss line indicator.
Suppose: If you make your own cable, we suggest labeling the
two sides of the same line with the same letter (A-to-A and
B-to-B, shown as below, or A1-to-A2 and B1-to-B2).
【
LED Indicator】
IES7110-2GS LED indictor light on the front panel .the
function of each LED is described in the table as below:
(AC power supply input did not have power supply indicator)
System status LED
LED
Indicator
Description
P1
ON
P1 connection regularly
OFF
P1 Power supply have no
connection or unwonted
P2
ON
P2 connection regularly
OFF
P2 Power supply have no
connection or unwonted
Alarm
ON
Power, port have alarm
OFF
Power, port have no alarm
Run
ON/OFF
Device unwonted
Blinking
Device working steadily
Link/ACT
(
1~8/G1~G2)
ON
Established effective network
connection
Blinking
Network in activity statues
OFF
Did not established effective
network connection
【
Installation】
Before installation, confirm that the work environment meet the
installation require, including the power needs and abundant
space. Whether it is close to the connection equipment and other
equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or
the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power: DC series support redundant 12-48VDC power input
AC series support 100-240VAC power input
6. Environment:working temperature -40~75℃
Relative humidity 5%~95%
DIN-rail installation
In order to apply for industrial environments conveniently,
IES7110-2GS series adopts 35mm DIN-Rail installation, the
installation steps are as follows:
1. Examine the DIN-Rail accessories
2. Examine DIN Rail is firm or not and the position is suitable or
not.
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will snap into place as shown
below.
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before cable
laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable laying;
3. The required cable specification, quantity, direction and laying
position need to match construction requirements, and cable
length depends on actual position;
4. All the cable cannot have break-down and terminal in the
middle;
5. Cables should be straight in the hallways and turning;
6. Cable should be straight in the groove, and cannot beyond the
groove in case of holding back the inlet and outlet holes. Cables
should be banded and fixed when they are out of the groove;
7. User cable should be separated from the power lines. Cables,
power lines and grounding lines cannot be overlapped and
mixed when they are in the same groove road. When cable is
too long, it cannot hold down other cable, but structure in the
middle of alignment rack;
8. Pigtail cannot be tied and swerved as less as possible. Swerving
radius cannot be too small (small swerving causes terrible loss
of link). Its banding should be moderate, not too tight, and
should be separated from other cables;
9. It should have corresponding simple signal at both sides of the
cable for maintaining.