ABB SACE Emax 2 Installation, Operation And Maintenance Instructions - page 12
Other manuals for SACE Emax 2:
Installation, Operation And Maintenance Instructions For The Installer And The User
Manual is about: low voltage air circuit-breakers
of
108
ABB | SACE Emax 2
10 | © 2014
ABB |
1SDH000999R0002 - L8569
Emax E1.2 circuit-breakers | 3 - Unpacking and handling
3 - Unpacking and handling
Opening the packaging
NOTE:
to unpack the circuit-breaker safely refer to the instruction sheet in the zipped packaging
pouch.
The following is the procedure for opening the packaging:
1. Cut the tape that seals the box. See Figure 5 e Figure 6.
Figure 5
Figure 6
2. Open the upper part of the packing box and remove the upper containment protection. See Figure 7
Figure 7
Figure 8
Continued on the next page