Ansal BlueStar Installation Manual - Wiring
12
2. Drainage test
Check whether the drainpipe is unhindered
New built house should have this test done before paving the ceiling.
1) Remove the test cover, and stow water of about 2000ml to the water receiver through
the stow tube. (Refer to chart 30)
Chart 30
(Take 36000Btu/h type as example)
Test cover
Water to the receiver
through the stow tube
3. Drain Elbow Installation (Cooling Only Type Without)
Fit
the
seal
into the drain elbow, then insert the drain elbow into the base pan hole of outdoor
o
unit, rotate 90 to
securely
assemble them. Connect the drain elbow with an extension drain
hose (Locally purchased), in
case of
the condensate draining off the outdoor unit during the
heating mode. (Refer to Chart 31)
Chart 31
Seal
The base pan hole
of outdoor unit
Drain elbow
Seal
The base pan
hole of outdoor
Drain
elbow
1. The air conditioner should use separate power supply with rated voltage
2. The external power supply to the air conditioner should have ground wiring, which is linked
to the ground wiring of the indoor and outdoor unit.
3. The wiring work should be done by qualified persons according to circuit drawing.
4. A leakage protector should be installed according to the National Standard concerning
electrical appliance.
5. Be sure to locate the power wiring and the signal wring well to avoid cross-disturbance and
their contact with connecting pipe or stop value body.
6. The wiring attached to this air conditioner is 10m long. Be sure to prolong it with wiring of
the same type and proper length if necessary. Generally, do not twist two wiring together
unless the joint is soldered well and covered with insulator tape.
7. Do not turn on the power until you have checked carefully after wiring.
WIRING
Attaching wiring