Ansal BlueStar Installation Manual - Install The Connecting Pipe

Summary of BlueStar

  • Page 1

    Installation manual for correct installation, read this manual before starting installation. This manual may be subject to change without notice for purpose of improvement. Air conditioner.

  • Page 2: Content

    Content installtion information...........................................................................1 accessories..................................................................................................1 installation place..................................................................

  • Page 3: Installation Information

    To install properly, please read this manual at first. The air conditioner must be installed by qualified persons. When installing the indoor unit or its tubing, please follow this manual as strictly as possible. When all the installation work is finished, please turn on the power only after a thoro...

  • Page 4: Installation Place

    The indoor unit the outdoor unit there is enough room for installation and maintenance. The ceiling is horizontal, and its structure can endure the weight of the indoor unit. The air outlet and the air inlet are not impeded, and the influence of external air is the least. The air flow can reach thro...

  • Page 5: Indoor Unit Installation

    Note: remark per emc directive 89/336/eec for to prevent flicker impressions during the start of the compressor (technical process), following installation conditions apply. 1. The power connection for the air conditioner has to be done at the main power distribution. The distribution has to be of a...

  • Page 6

    4 install and use directly the supporting angle steel. (refer to chart 4) for original concrete bricks use embedding screw bold, crock and stick harness. (refer to chart 3) steel roof beam structre steel bar hanging screw bolt hanging bolts supporting angle steel embedding screw bolt chart 3 chart 4...

  • Page 7

    5 install the main body chart 7 when using a back-air installation, please refer to the following: please explain clearly when ordering if customers need air inlet box. And note it is below air inlet or back air-inlet. B a 205 back panel layout chart 8 notice! This chart is based on 48000btu/h type,...

  • Page 8

    6 hang the belt on the hook of the main body. 3. Fix the outside frame and the canvas air passage with screws. Screw must be fixed on from the bottom to the top. Panel installation 1. Unload inner frame. Slide the knob, release the buckle from the outside frame hole, then unload the inner frame. 2. ...

  • Page 9: Install The Connecting Pipe

    7 6. Install the inner frame on the outside frame (the inverse sequence of unloading the inner frame). Note: connect the remote control receiver with the indoor unit signal wires and fix it. 5. Fix the main body and the outside frame with the fix board of waist-shape hole (in two places). Waist-shap...

  • Page 10

    Do not let air, dust, or other impurities fall in the pipe system during the time of installation. The connecting pipe should not be installed until the indoor and outdoor units have been fixed already. Keep the connecting pipe dry, and do not let moisture in during installation. 1) connect the indo...

  • Page 11: Refrigerant Pipe Connection

    2. Locate the pipe 1) drill a hole in the wall (suitable just for the size of the wall conduit, 90mm in general), then set on the fittings such as the wall conduit and its cover. 2) bind the connecting pipe and the cables together tightly with binding tapes. Do not let air in, which will cause water...

  • Page 12

    10 1 2 when the length of the one-way pipe is under 5m, the quantity of filling fluorine will be subject to the nameplate. When the length of the one-way pipe is over 5m, the quantity to be added is as follows: capacity 20000 btu/h: 0.03x(l-5) (unit: kg) capacity 24000 btu/h: 0.065x(l-5) (unit: kg) ...

  • Page 13: Connect The Drain Pipe

    Check all the joints with the leak detector or soap water. (see chart 27 as a reference illustration) note: in the chart a......Lo-stop valve b......Hi-stop valve c,d..Joints of the connecting pipe to the indoor unit. Check the leakage chart 27 b a d c check-point of indoor unit check-point of outdo...

  • Page 14: Wiring

    12 2. Drainage test check whether the drainpipe is unhindered new built house should have this test done before paving the ceiling. 1) remove the test cover, and stow water of about 2000ml to the water receiver through the stow tube. (refer to chart 30) chart 30 (take 36000btu/h type as example) tes...

  • Page 15

    13 the specification of power (a) 2 (mm ) 2 (mm ) 380v 3n~, 50hz type power ground wiring outdoor unit power wiring strong electric signal indoor/outdoor connecting wiring circuit breaker/fuse indoor unit power wiring phase 3-phase frequency and volt 40/25 20/15 1.5 24000-30000 btu/h 18000 btu/h 220...

  • Page 16

    14 wiring chart installing wiring chart, refer to link circuit chart for details. Ground wiring ground wiring power switch/fuse (available locally) power wiring (indoor) strong elec-signal link wiring weak elec-signal link wiring indoor unit outdoor unit grounding the air conditioner properly in cas...

  • Page 17

    15 l n 1 2 3 indoor unit xt2 t3 e y/ g xt1 power: 220~240v~ 50hz (3-core cable 2 3x2.5mm) 3-core cable 3-core cable 2 3x1.0mm 2 3x2.5mm 1-core sheild wire 2 1x0.5mm l n 1 2 3 outdoor unit xt 2 t3 e y&g xt3 outdoor unit 2 2 2 2 2 2 1 1 24000 btu/h type(1-phase) air condition link-circuit for r407c an...

  • Page 18

    1 power: 220~240v~ 50hz (3-core cable 2 3x3.0mm) 3-core cable 3-core cable 2 3x1.0mm 2 3x3.0mm 1-core sheild wire 2 1x0.5mm l n 1 2 3 outdoor unit xt 4 t3 e y&g xt3 a b c n 2 3 4 5 indoor unit xt3 t3 e y&g xt1 y&g 30000~36000btu/h type(1-phase) air condition link-circuit for r407c and r410a,heating&...

  • Page 19

    Power: 220v-240v 50/60hz 3-core cable 3x2.0mm 2 3-core cable 3x2.0mm 2 12000btu/h type(1-phase)air condition link-circuit power: 220v-240v 50/60hz 3-core cable 3x2.0mm 2 3-core cable 3x2.0mm 2 9000btu/h type (1-phase) air condition link-circuit chart 38 chart 39 for r407c and r410a,cooling only for ...

  • Page 20

    Power: 220v-240v 50/60hz 3-core cable 3x2.0mm 2 3-core cable 3x2.0mm 2 18000btu/h type(1-phase) air condition link-circuit power: 220v-240v 50/60hz 3-core cable 3x2.5mm 2 3-core cable 3x2.5mm 2 1-core cable 1x1.0mm 2 24000-36000btu/h type(1-phase) air condition link-circuit chart 41 chart 40 for r40...

  • Page 21

    T3 e 5v power: 380v 3n 50/60hz 5-core cable 5x1.5mm 2 5-core cable 5x1.5 2 2-core cable 2x1.0 2 2-core sheild wire 2x0.5mm 2 24000-30000btu/h type(3-phase) air condition link-circuit power: 380v 3n 5-core cable 5x2.5mm 2 5-core cable 5x2.5mm 2 1-core cable 1x1.5mm 2 36000-60000btu/h type(3-phase) ai...

  • Page 22

    Disassemble the bolts from the maintenance board, and pull it in the direction of the arrow to remove the protection board. Notice: do not scratch the surface during operation. Attention: chart 44 is based on one type of outdoor units, which may look different from your own outdoor unit. The outdoor...

  • Page 23: Test Opercetion

    1. The test operation must be carried out after the entire installation has been completed. 2. Please confirm the following points before the test operation: 3. According to the user s re quirement, in stall th e re mote c ontroller fr ame w here th e re mote controller s s ignal c an r each th e in...