INSTALLATION INSTRUCTIONS
Sketch C
Set Up:
The oven must be installed in a well-ventilated area.
Your oven is packed standing on its back. Leave in on
it’s back while unpacking. The skid may be left under
the oven for convenience in further handling. Unpack
carefully to avoid damage to the oven. If concealed
damage is found, follow the instructions detailed in
Receiving Section.
Keep the area around the oven free and clear of
combustible materials. Do not store any materials
on top of or under any oven. Provisions for adequate
air supply to your oven for ventilation and proper gas
combustion is essential. As a minimum, observe the
clearances detailed in Clearances Section.
Provide adequate ventilation and make up air in
accordance with local codes.
The oven must be installed under a ventilation hood.
Fit the flue diverter (see Sketch “C”) into the hole
in the top front of the oven and secure with the
screws supplied. Local inspectors and ventilation
specialists should be consulted to make sure that the
installation of the hood conforms to the local codes
and requirements (see Sketch “D”).
In the U.K., ventilation requirements detailed in BS
5440 should be followed.
Access to the bottom front door and left side control
panel is required for day to day operation of the oven
and for servicing. Make sure that these areas are kept
unobstructed for easy access.
A. Provisions must be made for easy access to the
louvered service panel on the left side of the unit.
A removable panel at least 16” x 31” (406 x 787
mm) in line with the service panel to facilitate
a service man to work will be satisfactory. See
installation sketch “A”.
B. Reference to back panels deleted. No longer
necessary.
C. Easy accessibility through the front of the oven
to the main burner, oven controls and flue
slide push/pull knobs must be provided. See
installation sketch “B”.
Sketch D