Barco CM50 Installation Manual - Ceiling Mount Cm50
Date : 25/10/95 R9827990-1
Ceiling Mount CM50
R9827990
R9827991
12
Mounting Instructions
Configuration B (continued)
Mounting the rods on the ceiling support
Turn a nut M12 (A) on one side of each rod.
Slide a washer (B) on each rod.
Slide a rubber washer (C) on each rod.
Slide another washer (D) on each rod.
Run the end of the each rod, on which the nut and
washers are mounted, through the provided holes
in the upper support and secure with a washer
(E), a rubber washer (F), a washer (G) and a nut
M12 (H).
Mounting the center plate on the rods
Mount the plate so that the distance between the ceiling and the
bottom side of the center plate is equal to CD - 22 mm (22 mm
is the height of the projector support).
Adjust the nuts on the rods until the center plate is water-levelled.
A
B
C
D
E
F
G
H
rods
center plate
Mounting the projector on the ceiling support.
A
Push the projector until the cone clicks securely into the lock
holder system.
Check if the projector is well locked.
If the projector is well locked, rotate the projector a little to the left
or to the right until the projector axis is perpendicular with the
screen.
Secure this position with the four tube bolts A.