Bartscher SMART IP24 Instruction Manual - 5.3 Operating
- 24 -
•
Drill two holes in the desired location in order to fix the unit to the wall / ceiling, while
maintaining the minimum distances given above.
•
Mount the appropriate pegs and attach the heater with two proper-sized screws in
the pre-bored holes
④
.
•
While drilling holes be careful to avoid any cables located behind the plaster.
•
Set the desired tilt angle.
Do this by loosening the screw
②
by the handle, set the desired tilt angle (0° to 90 °)
and turn the screw tightly with the proper wrench.
•
Ensure that the power cable is free to move.
•
The socket must be accessible to allow for the unit to be quickly disconnected from
its power source in case of need.
5.3 Operating
WARNING!
Turn the unit on only after it has been fully set-up and installed.
•
To turn the unit on, insert the plug into a single grounded socket.
•
To change the tilt angle, disconnect the unit from its power source by removing the
plug from its socket and leave the unit to cool for approx. 15 minutes. After the unit
cools, set the tilt angle in accordance with 5.2 “Installation and connection”.
②
③
①
④