Bunn Single TF DBC Installation And Operating Manual

Manual is about: W/SMART FUNNEL

Summary of Single TF DBC

  • Page 1

    Dual ® tf dbc ® with smart funnel ® s/n dual068000 & up installation & operating guide bunn-o-matic corporation post office box 3227 springfield, illinois 62708-3227 phone: (217) 529-6601 fax: (217) 529-6644 to ensure you have the latest revision of the manual or to obtain the illustrated parts cata...

  • Page 2

    Page 2 introduction the brewer incorporates a wireless interface system that allows the dbc grinder to load certain information into the "programming chip" located inside the handle of the funnel. This information includes what flavor of coffee is being ground and what batch size will be brewed (sma...

  • Page 3: Main On/off

    Page 3 00656.0000 00831.0000 00658.0000 20201.5600 user notices the notices on this brewer should be kept in good condition. Replace unreadable or damaged labels. 37881.0000 03408.0004 03409.0004 27508.0000 this equipment must be installed to comply with the international plumbing code of the intern...

  • Page 4

    Page 4 electrical hook-up warning – if the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personel with a special cord available from the manufacturer or its authorized service personel in order to avoid a hazard. Improper electrical installation will damag...

  • Page 5

    Page 5 green green l1, l2, l3, are the 3 phases v1 = phase to phase voltage, between any 2 phases. V2 = phase to neutral voltage, l1 to neutral must be 120v. System voltage v1 v2 208 208 120 240 240 120 caution: do not connect l1 to a cir- cuit operating at more than 150 volts to ground. 200 and 230...

  • Page 6

    Page 6 plumbing requirements this brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kpa) from a 1 ⁄ 2 " or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is...

  • Page 7

    Page 7 b b c c d d e f g operating controls operating controls (a) main on/off switch this switch, located under the brewer behind the front leg, turns power on and off to all components in the brewer. (b) batch selector switches pressing the switch corresponding to the small, medium, or large batch...

  • Page 8

    Page 8 initial setup caution – the brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions. 1. Insert an empty funnel into the funnel rails of one of the brew stations. 2. Place an empty server under the funnel. 3. Connect the brewer ...

  • Page 9

    Page 9 35058.1 080108 cleaning 1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on bunn-o-matic equipment. Do not clean this equipment with a water jet device. 2. Check and clean each sprayhead. The sprayhead holes must always rema...