Calix T073G HGU ONT User Manual - Activating The Ont
16
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© Calix. All Rights Reserved.
Activating the ONT
Once the ONT installation is complete, follow the procedure below for verifying ONT
status. Figures below shows the typical status LED display after the ONT boot sequence is
complete.
ONT Has Not Been Provisioned
ONT Has Been Provisioned
Verify that the POWER LED light is green, indicating that the local power level is within
proper limits.
Verify that the AUTH LED light is green, indicating that the ONT is operating normally.
The ONT is placed into service remotely through the OLT. Services to the ONT are likewise
provisioned and turned up remotely through the PON network.
If the AUTH LED is blinking, indicating that the ONT is communicating with the PON
network, no further activation is necessary and you can proceed to
Verifying Services (on
page 17).
If the AUTH LED does not light green, contact the Network Operation Center (NOC)
to activate the line. You may be required to provide or confirm the following information
about the ONT:
Vendor
Model number
Serial number
Once the ONT has been activated in the network, and the
AUTH LED is lit green, proceed
to
Verifying Services (on page 17).