CAME ZA3N Installation Manual - page 3
L1 L2
U
V
W
X
Y
E
E3
10 11 S
1
2
3
3P 4
5
7
2
C1 CX B1 B2
L1T
CT 0 12 24
L2T
L2T
L1T
1
2
3
4
0
12 24
(mm)
1
2
3
4
5
6
7
8
9
11
12
13
10
p.
33
- M
anu
al
31
9
U
4
6
EN
31
9
U
4
6
EN
v.
33
- 0
7/
20
15
- © C
ame S
.p
.A
. - T
he manu
al
's
c
onte
nts ma
y b
e e
dite
d at an
y time with
ou
t n
oti
ce
.
4.1 Dimensions, spans and anchoring holes
4.2 Main components
Warning! Before acting on the machinery,
cut off the main power supply.
* Found in the 230V FROG box. Connected them
up to the black (M1 motor) cables and red (M2
motor) cables fitted on the card; when coupling
with Ati, Fast, Ferni and Krono devices the cables
are not used because the condensers are already
connected up inside.
3 - Connection terminal boards
2 - Line fuse 5A
3 - Control unit fuse 3,15A
4 - Power up LED indicator 24V
5 - Buttons for memorising the radio code
6 - Operating time adjustment trimmer
7 - Trimmer for adjusting the automatic closure
time
8 - Trimmer for adjusting the delay of M2 during
closing and partial opening
9 - 10 DIP - Function selection
10 - Radio frequency card plug-in (see table)
11 - Signalling LED
12 - Torque limiter
13 - Condensers*
Bl
ack
White
Re
d
Or
an
ge
Bl
u
e
Vi
o
let
Red
Black