D'Alessandro Termomeccanica CSL100 Use And Maintenance Manual - page 8
8
Pic. 2
www.recal.cl ·
bio@recal.cl ·
(+562) 2430 7700
4 - TRANSPORT, HANDLING and INSTALLATION
4.1 General information
The machine must be supplied completely assembled and ready for the
installation.
4.2 Transport and Handling
The transport and handling operations must be carried out by proper means.
The heat generator is provided with a robust hook [14] for the coupler with slings (pict. 2)
4.3 Installation and testing
Only when the machine is completely installed that is only when it is positioned and levelled,
connected to the hydraulic circuit, connected to the electric board and supplied with the suitable
fuel, the testing can be carried out.
The installation of the machine must be carried out by specialised
staff, that must be provided with the installation qualification of
thermal and electric systems.
WARNING!
IT IS NOT ALLOWED TO MAKE THE SYSTEM WITH CLOSED AND
/OR PRESSURIZED EXPANSION VASSEL