E.C.A. Proteus Plus Blue 24 kW Installation And Operating Instructions Manual - page 12
10
in case of assembly of the device at attics or at rooms under the roof/terrace,
• The flue outlet should be at least 40 cm higher than the roof (Figure Sd and Se).
• The ceiling should be resistant to high temperature. "Hermetic flue group", enabling the fresh
combustion air supply and waste gas exit of the device, should be isolated with material resistant to
high temperature at the roof space.
• lf the ceiling is not of a material resistant to high temperature, the "hermetic funnel group" should be
isolated with incombustible material as from the ceiling passage, or should be taken within a separate
protection pipe.
• in respect of preventing condensation in the pipes, the part of hermetic flue up remaining at
the roof space should be isolated.
d)
e)
Figure 5
lssues to be Considered in Flue Connections
After determining the location where the combi boiler will be assembled,
• The locations of lock screws of wall hanger bracket and assembly bracket are marked by using
the assembly template on the last page of the usage and assembly guide of the device.
• After drilling the marked locations, the wall hanger bracket and assembly bracket are fixed to the
wall by using the dowel and lock screws provided in the packaging of the device.
• After hoisting the combi boiler, the hanger bracket behind the combi boiler is placed on the
hooks on the wall hanger bracket, and the combi boiler is hung on the wall.
/
/
Figure 6