G-Lite Luxury PP-8600 User Manual - page 5
5
ASSEMBLY
Assembly requires two people.
Set the treadmill in a cleared area and remove all packing materials. Do not
dispose of the packing materials until assembly is completed.
Assembly requires the included allen wrench
Unpacking your
ENERGY BOARD
where will be using it. Being careful
Not to damage . Place your
ENERGY BOARD
on a level flat surface.
It is recommended that you place a protective covering
on your floor.
STEP 1
.
Mount the stand tube onto the main unit,
connect the down- lead from the both parts.
See Figure 1 .
STEP 2
Attach the main tube to the vibrator
with bolts and washers provide.
STEP 3
:
Insert the parts of handle bar together,
Positioning by the 4 holes.
STEP 4
:
Put washers and bolts into their
correspondent holes and then fix them
with a spanner or wrench.