Lagoon 440 User Manual - page 31
Recommendations
A lot of skill and care is required to commission your boat for the first
time.
The future proper functioning of your boat and its equipment depends
on the quality of the commissioning operation.
In order to validate the warranty in the event of the failure of certain
equipment, the initial launch and equipment tests must be carried out
by your LAGOON dealer or agent.
z
BEFORE LAUNCHING
- If your boat is to be fitted with a sounder and speedometer, allow for
the relevant fittings and their installation.
- Check the water intake strain box for cleanliness.
- Check the engine and reduction gear oil levels (refer to engine
manual).
- All the optional accessories should be sealed with paste.
- Retract the speedometer into its housing (it may be damaged by the
handling belts).
- Turn off all the water inlet and drain valves (sink, washbasin, heads
and engine).
z
HOISTING
Tie off the vessel fore and aft with fenders.
Prepare:
- 2 belts (minimum 11 meters).
- 4 slings (see diagram opposite).
- Attach the 4 slings to the belts.
LAUNCHING
29
LAUNCHING
3
LAGOON 44O
RECOMMENDATION
All future maintenance should be carried out with
the greatest care by professionals.
If the LAGOON boatyard is not involved in
maintenance operations, your guarantee will not
cover any incidents linked to handling errors.