Lantronix PremierWave Quick Start Manual - Introduction
Introduction
Introduction
Thank you for purchasing the Lantronix® PremierWave® evaluation board or development kit.
This quick start guide describes the procedures for initial connection to the PremierWave device
through either a network connection or serial port. This user guide can be used for the
PremierWave EN and PremierWave SE1000 embedded system on modules.
Once a connection is established you can use the command line interface (CLI) for configuration
and control.
Evaluation Board Contents
♦
PremierWave Evaluation Board
♦
12V wall-mount power supply AC/DC, 1A
Development Kit Contents
♦
PremierWave Evaluation Board
♦
12V-wall-mount power supply AC/DC, 1A
♦
Ethernet cable 10 ft
♦
Type-A to Mini Type-B USB cable
♦
RS-232, DB9F/F, 10 ft, null modem cable
♦
Antenna - 2.4 GHz/5 GHz 2.15 dbi reverse polarity SMA*
♦
SMA to UFL adapter cable*
Notes:
*Items listed in the development kit are only available with the PremierWave EN
model. The PremierWave device must be purchased separately.
PremierWave® Evaluation Board Quick Start
5