Pacific Energy DESIGN-D Installation And Operating Instructions Manual - page 6
6
STEP.D1 090709-16
Chimney Installation
NOTE: Longer chimney lengths and different pitch
flashings may be used. All other parts listed must be
installed (see Figure #2, Page 7). Install all components
to the connector or chimney manufacturer's installation
requirements. Consult your chimney supplier for instal-
lation advice.
Procedure:
CAUTION: THE STRUCTURAL INTEGRITY OF THE MO-
BILE HOME FLOOR, WALL AND CEILING/ROOF MUST BE
MAINTAINED.
Note: See "Combustion Air" section on page 9.
1. Position stove and floor protection with hole for combus-
tion air in accordance with the clearances as stated
on the label and in Figure #1.
2. Mark the position for the hole in the ceiling and roof
by using a string and plumb-bob.
3. Check that the intended location will not interfere with
floor joists, ceiling joists or rafters before proceeding
further.
4. Cut a hole in the ceiling and roof to suit the chimney
system and frame in the sides. The chimney support
is mounted to the framing.
Mobile Home Installation
Warning: Under no circumstances is this heater to be
installed in a makeshift or "temporary" manner. It may be
fired only after the following conditions have been met.
-
DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE
SERVING ANOTHER APPLIANCE.
-
DO NOT INSTALL IN A SLEEPING ROOM.
- Outside air supply must be used for Mobile Home
instalations see Figure #2, Page 7.
- We recommend that our woodburning hearth
products be installed and serviced by professionals
who are certified in the U.S. by the National Fireplace
Institute
®
(NFI) as NFI woodburning Specialists or who
are certified in Canada by Wood Energy Technical
Training (WETT)
.
Clearances
This heater must be installed with listed double-wall con-
nector and compatible chimney system listed on page 7.
Clearances to combustible surfaces and materials are
shown in Figure #1, page 5 and Figure #2, page 7.
Clearances may be reduced with various heat insulating
materials. Consult local fire codes and authorities for
approval.
Leg Kit
1) Remove the front cover from the leg assembly by remov-
ing the two #8 x 1/2" screws located on the left and right
sides.
2) With the unit on its back and the open end of the leg as-
sembly facing up, align the legs and leg assembly mounting
holes with the holes on the stove body.
3) Secure to stove body with 1/2" bolts previous;y
removed.
4) Replace the front cover plate or insert ash pan and carefully
place the unit in the upright position.
Optional Ash Cleanout System
1) With stove body laying on its back, remove the 1/4" x 1"
Tek screw located at the top left of the stove bottom.
2) Remove the ash system hole cover and gasket located under
the stove. Discard cover plate and gasket.
3) Place new gasket provided over existing bolts.
4) Install ash dump system over gasket and secure with two
nuts previously removed.
5) Install the 1/4" Tek screw in the original hole and secure.
Assembly
Crate Removal
1) Carefully remove wood top and supports.
2) Remove plastic cover.
3) Place stove body carefully on its back.
4) Using 3/4" wrenches, remove 1/2" bolts and washers
from stove bottom.
Pedestal Kit
1) Remove the front cover from the pedestal by removing the
#8 x 1/2" screw located on the upper center of the cover.
2) With the unit on its back and the open end of the pedestal
assembly facing up, align the leg assembly mounting holes
with the holes on the stove body mounting brackets.
3) Secure to stove body with 1/2" bolts previously removed.
4) Replace the front cover plate or insert ash pan and carefully
place the unit in the upright position.