Pacific Energy neo 1.2 Installation & Operating Instructions Manual - Troubleshooting

Summary of neo 1.2

  • Page 1

    Neo 1.2 eu-en installation & operating instructions safety notice if this stove is not properly installed, a house fire may result. For your safety, follow the installation instructions. Contact local building or fire officials about restrictions and installation, inspection requirements in your are...

  • Page 2: Table of Contents

    090816-16_neo 1.2 eu-en please save these instructions this manual describes the installation and operation of the pacific energy, neo 1.2/neo 1.2 short freestanding wood heater. Safety notice: if this stove is not properly installed, a house fire may result. For your safety, follow the instal- lati...

  • Page 3: Approvals

    310816-28_neo 1.2 eu-en operator instructions uk - the clean air act 1993 and smoke control areas. The neo 1.2 and neo 1.2 short have been recommended for use in smoke control areas when burning seasoned cord wood. Hetas ltd approval; these appliances have been approved by hetas ltd as an intermitte...

  • Page 4: Safety

    310816-28_neo 1.2 eu-en operator instructions chimney fires the result of excessive creosote buildup is a chimney fire. Chimney fires are dangerous. Chimney inside temperatures can exceed 1100°c. This causes much higher than normal temperatures in the chimney and on its exterior surfaces. Thus ignit...

  • Page 5

    310816-28_neo 1.2 eu-en operator instructions warning note properly installed, operated and maintained this stove will not emit fumes into the dwelling. Occasional fumes from de ashing and re fuelling may occur. However, persistent fume emission is potentially dangerous and must not be tolerated. If...

  • Page 6: Operation

    310816-28_neo 1.2 eu-en operator instructions • salt water wood • wet or green wood • treated wood • unseasoned wood • coal/charcoal • solvents • railroad ties • garbage • lawn clippings/yard waste • manure or animal remains • materials containing rubber, including tires • materials containing plast...

  • Page 7

    310816-28_neo 1.2 eu-en operator instructions how to test your wood add a large piece of wood to the stove when it has a large, hot bed of coals. It is dry if it is burning on more than one side within one minute. It is damp if it turns black and lights within three minutes. If it sizzles, hisses an...

  • Page 8

    310816-28_neo 1.2 eu-en operator instructions warning: do not use grates or andirons to elevate the fuel. Burn directly on the fire bricks. Replace broken or missing bricks. Failure to do so may create a hazardous condition. Restarting from hot embers if there is insufficient burning material in the...

  • Page 9: Maintenance Checks

    310816-28_neo 1.2 eu-en operator instructions maintenance checks check the following parts for damage such as cracks, excessive corrosion, burned out sections and excessive warping: (see website for descriptions and more detail) some warping of the baffle is normal (up to 6mm). Replace if the baffle...

  • Page 10

    310816-28_neo 1.2 eu-en operator instructions warning: only use materials and components supplied by manufacturer when doing maintenance or replacements. Spare parts: for more information on obtaining spare parts, please contact your pacific energy stove dealer. For a dealer directory use www.Pacifi...

  • Page 11: Troubleshooting

    310816-28_neo 1.2 eu-en operator instructions problem cause cure glass is dirty 1. Wood is wet - use dry wood 2. Turning down air control - do not turn down until or damper too soon a) there is a good bed of coals b) the wood is charred 3. Draft too low - improper chimney height and / or diameter - ...

  • Page 12: Warranty Information

    310816-28_neo 1.2 eu-en operator instructions warranty information pacific energy limited lifetime warranty wood products pacific energy extends the following warranty coverage to the original registered purchaser of the product: ltd lifetime coverage (15 years) • limited lifetime coverage is extend...

  • Page 13: Stove Dimensions

    Installation instructions stove dimensions 615mm 650mm 690mm 380mm figure 1: ne12.24 dimensions. 807mm 841mm 688mm 420mm 89mm figure 2: ne12.32 dimensions. Neo12 short dimensions neo12 dimensions 13 310816-24_ neo 1.2 5055.600eu-a.

  • Page 14: Assembly

    Installation instructions side panel installation 1. Carefully remove the panels from the box. 2. Loosen the panel bracket screws a little so that the bracket can move while fitting the panel into place (figure 6). 3. Engage the tabs of the panel into the slots in the front mounting bracket (figure ...

  • Page 15

    Installation instructions figure 5: slide panel in to place. Tab tab tab tab panel bracket figure 4: panel bracket.Ai figure 6: panel adjustments. Align panel with unit base figure 7: base of panel and alignment. 15 310816-24_ neo 1.2 5055.600eu-a.

  • Page 16: Installation

    Installation instructions installation health and safety precautions special care must be taken when installing the stove such that the requirements of the health and safety at work act are met. Handling adequate facilities must be available for loading, unloading and site handling. Fire cement some...

  • Page 17: Hearth

    Installation instructions 150mm 300mm 150mm 150mm figure 9: neo 1.2 floor protector eu important warning this stove must not be installed into a chimney that serves any other heating appliance. There must not be an extractor fan fitted in the same room as the stove as this can cause the stove to emi...

  • Page 18: Chimney and Connector

    Installation instructions chimney and connector connection to chimney tis stove has a top flue gas connector that allows connection to either a masonry chimney or a prefabricated factory made insulated metal chimney in accordance with their instructions. In some cases it may be necessary to fit an a...

  • Page 19: Combustion Air Supply

    Installation instructions combustion air supply in order for the stove to perform efficiently and safely there must be an adequate air supply into the room in which the stove is installed to provide combustion air. The provision of air supply to the stove must be in accordance with current building ...

  • Page 20: Optional Blower

    Installation instructions optional blower the optional blower kit (wodc.Eublowb) is equipped with a three prong power cord and may be installed at any time. Follow installation instructions supplied with the kit. Route power supply cord away from heater. Electrical rating: 230 volts a.C., 50hz, .3 a...

  • Page 21

    Installation instructions fireclay flue liner concrete cap chimney approved through - wall installation as per local and national codes 1m minimum 1m non-combustible floor protector hooded vent or 90 elbow turned down *3” (75mm) diameter air inlet with rodent screen *if the crawl space is well venti...

  • Page 22

    Installation instructions spark arrester rain cap certified chimney storm collar roof flashing chimney support wall thimble alternate up and out installation non-combustible floor protector hooded vent or 90 elbow turned down attach to floor for mobile homes 3" diameter air inlet with rodent screen....

  • Page 23

    Installation instructions complete brick set ..........................................................Ne12.Bric-a a 4 1/2” x 5 1/2” x 1 1/4” ............................(39 mm x 115 mm x 32 mm) b 3” x 4 1/2” x 1 1/4” ...................................(77 mm x 115 mm x 32 mm) c 9” x 4 1/2” x 1 1/4”...

  • Page 24: Replacement Parts - Neo 1.2

    Installation instructions 1............ Enamel panel set (32" tall) ........ Ne12.32ppxxa .............. Enamel panel set (24" tall) ........ Ne12.24ppxxa (xx = color codes) 1(a) ....... Painted panel set (32"tall) ......... Ne12.32pmbka .............. Painted panel set (24" talll) ....... Ne12.24pm...

  • Page 25: Rating Label

    170616-24_neo 1.2 eu-en english francais esp anol da ta co emissions (at 13% o²)% Émissions de co (à 13% o m² )% emisiones de co (al 13% de o ²)% 0.21% particle emissions to 13% o² Émissions de particules à 13% o ² emisiones de partículas a 13% de o ² 51 mg / nm ³ smoke te mperatur et empèrature fu...

  • Page 26

    310816-28_neo 1.2 eu-en operator instructions 26 5055.600eu-a.

  • Page 27

    310816-28_neo 1.2 eu-en operator instructions 27 5055.600eu-a.

  • Page 28

    Pacific energy fireplace products ltd. 2975 allenby rd., duncan, b.C. V9l 6v8 for technical support, please contact your retailer. Web site: http://www.Pacificenergy.Net printed in canada © 2016 copyright pacific energy fireplace products ltd reproduction, adaptation, or translation without prior wr...