Pacific Energy PACIFIC FP30 Installation And Operating Instructions Manual - Contents

Manual is about: ZERO CLEARANCE WOOD FIREPLACE B series

Summary of PACIFIC FP30

  • Page 1

    190712-28 pacific fp30 5055.5152 installation and operating instructions safety notice if this stove is not properly installed, a house fi re may result. For your safety, follow the installation instructions. Contact local building or fire officials about restrictions and installation inspection req...

  • Page 2: Contents

    2 pacific fp30 190712-28 note: we strongly r e c o m m e n d t h at smoke detectors be installed. If smoke detectors have been previ- ously installed, you may notice that they are operating more frequently. This may be due to curing of stove paint or fumes caused by accidentally leaving the fi re do...

  • Page 3

    Pacific fp30 190712-28 3 safety and maintenance 1. Burn only, dry and well seasoned cord wood. The denser or heavier the wood when dry, the greater its heat value. This is why hardwoods are generally preferred. Green or wet wood should not be used, it will reduce heat output, as well as, contributin...

  • Page 4

    4 pacific fp30 190712-28 creosote formation and need for removal when wood is burned slowly, it produces tar and other or- ganic vapours, which combine with expelled moisture to form creosote. The creosote vapours condense in the relatively cool chimney fl ue of a slow burning fi re. As a result, cr...

  • Page 5

    Pacific fp30 190712-28 5 operation caution: hot while in operation. Keep children, clothing and furniture away. Contact may cause skin burns. Warning: over firing the appliance will short- en the life of the product. Failure to rectify an over firing condition can be hazardous and may void the manuf...

  • Page 6

    6 pacific fp30 190712-28 baffle removal baffle should only be removed when chimney is being cleaned. Do not operate with baffle assembly or insulation removed. Removal remove retaining pin at the rear inside top of the fi rebox, just under the baffle. Lift baffle up and pull forward to disconnect fr...

  • Page 7

    Pacific fp30 190712-28 7 fig. #5 nuts blower replacement 1. The blower is located in the bottom rear compartment of the woodstove and can be accessed by removing the access panel on the bottom of the fi rebox. Remove the bricks to expose the access panel, then remove the 8 bolts or screws holding th...

  • Page 8

    8 pacific fp30 190712-28 item size part number a 9” x 4 1/2” x 1 1/4” (230 mm x 115 mm x 32 mm) 5096.99 b 9” x 3 1/2” x 1 1/4” (102 mm x 115 mm x 32 mm) 3245.501 c 7 1/4” x 4 1/2” x 1 1/4” (184 mm x 115 mm x 32 mm) 245.001 firebrick installation this package contains 19 full-size fi rebricks, as wel...

  • Page 9

    Pacific fp30 190712-28 9 fireplace installation crate removal 1) carefully remove wood top and supports. 2) remove the screws securing the fi replace to the pallet(4). 3) remove from pallet bottom. Warning: under no circumstances is this heater to be installed in a makeshift or "temporary" manner. I...

  • Page 10

    10 pacific fp30 190712-28 fp30 45" 44" 30 3/4" 11 1/4" 21 7/8" 28 1/8" 29 1/2" 25" dimensions clearances this heater must be installed with a listed compatible chimney system listed on page 15. Clearances to combustible surfaces and materials are shown on pages 12, 13 & 14. Clearances may be reduced...

  • Page 11

    Pacific fp30 190712-28 11 26" 60" 10" 77 3/8 " 38 3/4 " 109 1/2 " 77 3/8 " 27 3/8 " 50 5/8 " 50 5/8 " 61 3/4 " 50 5/8 " 1" 6 3/8 " minimum framing dimensions fig. #10 note: the framing dimensions around the fireplace must include the inner drywall board..

  • Page 12

    12 pacific fp30 190712-28 item part # description qty. 1 5049.9912 screw, teks pkg #8 x 1/2” 40 2 7746 stud, top/bottom 50 1/2”l 2 3 9093.22 stud, cntr support sides, 15”l 5 4 7747 framing kit leg 3 1/2"l 3 framing kit assembly 2 3 each kit contains: assembly • lay out top/bottom studs (2) and cente...

  • Page 13

    Pacific fp30 190712-28 13 minimum clearances to combustibles 6 3/8" 6 3/8" 27 3/8" 30" 10" 9" 1" fig. #11.

  • Page 14

    14 pacific fp30 190712-28 fig. #12 chimney roof fl ashing storm collar * 4" diameter combustion outside air inlet. One on either side of unit. A 4" outside air inlet is also on the left side of the unit for outside fan air. The combustion air inlets can be rotated to draw air from the rear of the un...

  • Page 15

    Pacific fp30 190712-28 15 listed chimney and chimney connector this appliance must be installed with one of the following compatible chimney systems - all parts 6": manufacturer brand type inner diameter canada only: icc excel 1" solid pack. 6" (152mm) usa only: security secure temp asht 1" solid pa...

  • Page 16

    16 pacific fp30 190712-28 offsets 15' 30° or 45° elbows the chimney for the fp30 can be installed with a maximum of four 45° elbows(in canada) and four 30° elbows(in u.S.A.) as shown in fig. #13. Installation: 1. Install the fi rst elbow; turn it in the required direction. It is required to secure c...

  • Page 17

    Pacific fp30 190712-28 17 combustion air intake or combustion air can be supplied to the stove in one of two ways. Consult your local building code or can/csa- b365, installation code for solid-fuel-burning appliances and equipment before proceeding. 1. Outside air supply - outside air may be drawn ...

  • Page 18

    18 pacific fp30 190712-28 18" [457mm] 8" [203mm] 8" [203mm] 19 1/8" [486mm] 18" [457mm] 8" [203mm] 8" [203mm] 58" [1.47m] canada only floor protector the stove may be installed on a combustible fl oor provided non-combustible ember protection, such as tile, metal, brick, etc., is used in front of th...

  • Page 19

    Pacific fp30 190712-28 19 67” min 60 1/2”min gravity vent air inlet remote heat duct installation in u.S.A., a minimum of one remote gravity heat duct kit must be installed with the fp30. Part# fp30.Gvkit installation: 1. Using a pair of tin snips, cut away the square section block- ing the heat duc...

  • Page 20

    20 pacific fp30 190712-28 11 1/4” 9 3/4” fig. #21 fig. #22 3. Locate and cut a 11 1/4” x 9 3/4” opening in the wall or facing material being sure to maintain structural integrity. Position the pre-assembled wall outlet in the hole and secure with two screws(fig.#21). 4. The outlet must be a minimum ...

  • Page 21

    Pacific fp30 190712-28 21 cement board installation the front facing area of the fp30 must be covered with non- combustible cement board as shown in fig.#24 and #25 prior to applying any fi nishing material. The cement board can be attached to the framing and to the front of the unit outside of the ...

  • Page 22

    22 pacific fp30 190712-28 mantel clearance a-canada 42”(no gravity vent) a-canada 34"(gravity vent) a-u.S.A. 34" mantel depth b 2" to 12" mantel clearance chart 16 1/2” non-combustible facing material covering from the convection air out- let to the ceiling. Non-combustible zone. Do not install any ...

  • Page 23

    Pacific fp30 190712-28 23 troubleshooting problem cause cure glass is dirty 1. Wood is wet - use dry wood 2. Turning down air control - do not turn down until or damper too soon a) there is a good bed of coals b) the wood is charred 3. Draft too low - improper chimney height and / or diameter - chim...

  • Page 24

    24 pacific fp30 190712-28 operating tips 1. Always use dry, seasoned fi rewood, up to 20" long. Load wood endwise, a mixture of large and small pieces, on top of a good ash base (1" minimum). 2. Operate on a medium to high setting, for up to 1 hour from cold start. After the initial warm up pe- riod...

  • Page 25

    Pacific fp30 190712-28 25 replacement parts item description part no. 1............ Inlet air shield ............................................... 7719.5 2............ Cast ash lip .................................... Alip.50374753 3............ Blower ................................................

  • Page 26

    26 pacific fp30 190712-28.

  • Page 27: Caution

    Pacific fp30 190712-28 27 label le systÈme de cheminÉe doit Être homologuÉ comme suit : au canada - cheminÉe homologuÉe ulc-s-629, icc le systÈme de cheminÉe doit Être homologuÉ comme suit : au canada - cheminÉe homologuÉe ulc-s-629, icc (industrial chimney company). Aux États-unis - cheminÉe homolo...

  • Page 28

    Pacific energy fireplace products ltd. 2975 allenby rd., duncan, b.C. V9l 6v8 phone: 250-748-1184 web site: http://www.Pacifi cenergy.Net printed in canada.