For the 24 BTV flue-gas is removed and
combustion air is brought in by a special
double duct. Double-duct routes can be
completed from the standard parts sup-
plied by the manufacturer for virtually any
sit u a tion. The route must be designed to
enable removal of condensed flue vapours
out of the duct. Special con den sate-dis-
charge elements can be used for that
purpose. If any defects are caused by the
condensation, they will not be cov ered by
the warranty. Due to the variability of local
conditions, the double duct elements are
not in clud ed in the de liv ery or in the boil-
er’s price. Principles for completion of the
routes – see. chapter “Air and flue ducts.”
For the 24 BOV flue-gas is removed by
means open chimney draught. Minimal
required chimney draught in steady stage
is 2 Pa. Connection to the chimney is via
a connecting flue pipe with diameter cor-
responding to flue outlet on the boiler (125
mm). Installation of both the boiler and the
connecting flue pipes with chimney must
comply with valid standards. The stand-
ard's requirements prevent appearance of
adversary effects, such as excessive cool-
ing of the flue gases, penetration of the
chimney wall by humidity, and variability
of chimney draught which would affect the
boiler operation in an undesirable manner.
The connecting flue pipes are not included
in the boiler delivery.
Caution:
Elements reducing the chimney
draught (such as various exchangers for
using the residual heat) are prohibited
from being inserted in the connecting
flue pipe.
The 24 BOV takes combustion air from the
space around it. There must be possibility
of direct space ventilation and sufficient
combustion air supplies comply with valid
standards.
Delivery completeness
BTV /BOV boiler is delivered in assembled
state and functionally tested.
Delivery contains (see fig. 9):
1. Boiler
2. User and installation instruction
3. Service book
4. List of Service centres
5. Certificate of Warranty
6. Template
7. Drawbar for hanging of boiler
Additional accessories
Following accessories can be ordered
according to various requirements;
1. Connecting set, supply number XXXX
(see fig. 10)
2. Flue gas and air ducts 100/60 for BTV
version e.g.:
- S5D-1000 Horizontal set (elbow with flan-
ge 90°, 1m horizontal terminal), supply
number 7194
- K1D Elbow 90°, supply number 2842
- T1D-1000 Extension 1m, supply number
2825
- S3 Vertical terminal, supply n. 2805
- Z1 Condensate retainer, supply n. 2857
3. Flue gas and air ducts 80/80 for BTV
version e.g.:
- S2 Air-flue duct set (separator, 2x elbow
90°, 2x 1m horizontal terminal) , supply
n. 2803
- K2A Elbow 90°, supply n.
- T2 Extension 1m, supply n. 2819
- S4 Vertical terminal, supply n. 2809
- Z2 Condensate retainer, suply n. 2858