Protherm Tiger 24 (12) KTZ Operating And Installation Manual - Introduction
Supplied By www.heating spares.co Tel. 0161 620 6677
2
1. The boiler and all associated equipment
must be installed and used in accordan-
ce with the installation design, all appli-
cable legal regulations, technical stan-
dards and with the manufacture’s in-
structions. The boiler may be used only
for the designed purpose.
2. The boiler may be installed only in an en-
vironment for which it is designed. If the
boiler is delivered by the same person
that did the installation, such person
must handover to the user all accompa-
nying documentation (namely Operating
Guide, Service Book, etc.) All original
packaging materials must remain avai-
lable for transport until the boiler is put
into operation.
3. After installation, the boiler may be put
into operation by an authorised service
organisation only.
4. The boiler complies with regulations ap-
plicable in the Slovak Republic. When
used in the conditions of other countries,
any deviations from local regulations
must be identified and rectified.
5. In the event of a defect, call the manu-
facturer’s service organisation – any
unauthorised interference may damage
the boiler (and possibly also associated
equipment!).
6. The service technician putting the boiler
into operation for the first time must show
the boiler operation, boiler safety com-
ponents, their function and necessary
user reaction, significant boiler compo-
nents, and how to control the boiler. If
the service technician putting the boiler
into operation is also the supplier, it must
ensure, that original packaging materials
remains available for possible transport
until the boiler is put into operation
7. Check the delivery for completeness.
8. Check whether the model and type sup-
plied is suitable for the required use, i.e.
check whether boiler settings on the ma-
nufacturing tag correspond to the local
fuel (gas) supply parameters, or let the
person who will install or put the boiler
into operation perform this check.
9. Whenever you are not certain how to
control the boiler, study appropriate in-
structions in this Operation and Installa-
tion Guide carefully and proceed accor-
dingly.
10. Never remove or damage any markings
and signs on the boiler. Also keep the
original packaging material undamaged
for transport purposes, until the boiler is
put into operation.
11. When making any repairs, only original
parts must always be used. It is forbid-
den to make any changes to the boiler’s
internal installation, or to interfere with it
in any way.
12. When shutting the boiler down for a lon-
ger period of time, we recommend to
turn the gas supply off and disconnect
the boiler from power supply. This re-
commendation applies in conjunction
with the general conditions stipulated in
this Operation and Installation Guide.
13. At the end of its useful life, the boiler or
its parts must be disposed of ecological-
ly, to avoid causing any damage to the
environment.
14. The manufacturer disclaims any respon-
sibility for damages caused by the failure
to observe:
• the conditions stipulated in this Operati-
on and Installation Guide;
• applicable regulations and standards;
• good installation and operation procedu-
res; and
• conditions stated in the Warranty Certifi-
cate and the Service Book.