Situations might occur in practice, when
the following essential measures must be
adopted:
• prevent the boiler from (even accidental-
ly) being turned on while conducting in-
spections or working on the combustion
gasses flue route or gas and water distri-
bution pipes, by disconnecting the boiler
from power supply also by other means
than merely turning the main switch off
(e.g. by pulling the power cord plug out
of power socket);
• shut the boiler down every time when
there are any (even temporary) flam-
mable or explosive fumes present on the
premises from which combustion air is
supplied to the boiler (e.g. from paint
when painting, laying and spraying mol-
ten substances, from gas leaks, etc.);
• if it is necessary to drain water from the
boiler or from the whole system, the wa-
ter must not be dangerously hot;
• when water is leaking from the boiler’s
heat exchanger or when the exchanger
is clogged up with ice, do not attempt to
start up the boiler until normal operating
conditions have been restored;
• when a gas leak has been detected or
gas supply has been interrupted, or if is
suspected that this has happened, shut
the boiler down, turn the gas supply off
and call the gas supply company or a
service organisation.
Safety of equipment and people
• The boiler (and its additional equipment)
complies with the type verified by the En-
gineering Testing Institute in Brno, heat
and ecological equipment testing labora-
tory, as the testing organization and Cer-
tified Body No. 1015, which issued its
decision that the boiler has been certi-
fied and complies with the requirements
of European Directive 90/396/EEC, 92/
42/EEC, 73/23 EEC and 89/336 EEC,
which set out requirements for gas-fuel-
led appliances, efficiency of hot-water
boilers fired by liquefied or gaseous fuels
electrical equipment with low voltage
and electromagnetical compatibility. Fur-
thermore it complies with Slovak techni-
cal specifications STN EN 50 165, STN
EN 437, STN EN 483, STN EN 625 and
STN EN 60 335 – 1; it also complies with
STN 06 1008 and Act No. 513/1991 the
Commercial Code, Act No. 634/1992
and Public Notice of the Ministry of Heal-
th of CSR No. 13/1997, including all their
later amendments.
• In order to run and operate the boiler in
accordance with the purpose for which it
is designed in actual conditions of use
(hereafter referred to only as use), it is
necessary to abide also by additional re-
quirements – the most essential ones of
which (i.e. those which must not be omit-
ted) are found in the following regulatory
documents:
- in the design area: STN 06 0310 and
STN 06 0830 (also STN 73 4201 for type
KOZ);
- in the fire safety area: STN 92 0300;
- for installation and assembly (and re-
pairs): STN EN 1775 or STN 38 6460
(also STN 73 4201 for type KOZ), Public
Notice No. 48/1982 (as amended) and
binding occupational safety regulations;
- during running and operation: STN 38
6405.
• In addition to the above mentioned docu-
ments, it is necessary when using the
boiler to proceed in accordance with this
Operating Guide and the accompanying
boiler manufacturer’s documentation.
Any interference by children, persons
under the influence of narcotic drugs,
certified persons, etc., when using the
boiler, must be prevented.