PS Audio MultiWave P600 Upgrade Instructions

Other manuals for MultiWave P600: Installation Instructions, Owner's Manual
Manual is about: Power Plant Series

Summary of MultiWave P600

  • Page 1

    1 power port upgrade instructions for p300 and p600 power plants please read these instructions before attempting to install the new ps audio power port ac receptacles in your p300 or p600 power plant. These new receptacles replace the existing hospital grade receptacles and are designed to improve ...

  • Page 2

    2 step two remove the bottom cover. To remove the bottom cover of the p300, turn the unit upside down. Note the phillips screws along the outer edge of the bottom cover. Remove these screws. Place the screws in a cup or safe area. Gently pull the bottom cover off of the p300. The bottom cover is use...

  • Page 3

    3 step two remove the wires on one outlet at a time. There are four wires connecting the outlet: black, white and two green*. Remove the black and white wires, by loosening the side-mounted screws on the outlet. The wires will pull out easily. The green wires are removed by unscrewing the green phil...

  • Page 4

    4 attach the two ground tabs (two green wires each) to the mounting screw of the bottom outlet. Use the screw that is nearest the ground terminal. The tabs go on after the power port and mounting screw is inserted and right before the nut. This completes the ground for the catv filter and chassis. T...