Quadra-Fire 31I-ACC Installation manual

Manual is about: 3100-I ACC WOOD INSERT Automatic Combustion Control (ACC)

Summary of 31I-ACC

  • Page 1

    1 7044-225b april 9, 2014 3100-i acc wood insert automatic combustion control (acc) model(s): 31-i acc o-t l tested and listed by portland oregon usa omni-test laboratories, inc. C us hot surfaces! Glass and other surfaces are hot during operation and cool down. Hot glass will cause burns. • do not ...

  • Page 2

    2 7044-225b april 9, 2014 31-i acc 1 important safety information a.Insertcertification .............................................................3 b.Btu&efficiencyspecifications........................................3 c.Mobilehomeapproved .................................................... 3 d...

  • Page 3

    April 9, 2014 7044-225b 3 31-i acc model: 3100-i(acc)insert laboratory: omnitestlaboratories,inc. Report no: 061-s-74-6.2 type: solidfueltype,listedroomheater standard: ul1482 and ulc s628-93 and (um)84-hud,mobilehome approved. Epacertified: 2.0 grams per hour efficiency: up to 79.8% epa btu output:...

  • Page 4: Install Guide

    4 7044-225b april 9, 2014 31-i acc install guide 2 getting started a. Design and installation considerations beforeinstalling,determinethefollowing: • typeofchimneyconnectortobeused · singlewall,6inch(152mm)diameter,stainlesssteel,or ·doublewall,6inch(152mm)diameter,stainlesssteel • consultpage28for...

  • Page 5

    April 9, 2014 7044-225b 5 31-i acc c. Negative pressure negativepressureresultsfromtheimbalance ofairavail- ablefortheappliancetooperateproperly.Itcanbestron- gestinlowerlevelsofthehouse. Causesinclude: • exhaustfans(kitchen,bath,etc.) • rangehoods • combustionairrequirementsforfurnaces,waterheaters...

  • Page 6

    6 7044-225b april 9, 2014 31-i acc attention installer: follow this standard work checklist thisstandardworkchecklististobeusedbytheinstallerinconjunctionwith,notinsteadof,theinstructionscontainedinthisinstallationmanual. Customer: date installed: lot/address: location of fireplace: installer: deale...

  • Page 7

    April 9, 2014 7044-225b 7 31-i acc figure 7.1 top view figure 7.2 front view figure 7.3 - side view a b 27-5/8 in (702mm) 23-13/16 in (589mm) 38-9/16 in (979mm) 5-1/2 in (140mm) 5-11/16 in (144mm) 8-1/2 in (216mm) cl 7-3/4 in (197mm) 12-1/2 in (318mm) 26-3/4 in (679mm) 23-1/4 in (591mm) 14-1/4 in (3...

  • Page 8

    8 7044-225b april 9, 2014 31-i acc note: clearances may only be reduced by means approved by the regulatory authority having jurisdiction fire risk. • complywithallminimumclearancesto combustiblesasspecified. • failuretocomplymaycausehousefire. Warning incanadaafulllength6inch(152mm)s635fluelinerreq...

  • Page 9

    April 9, 2014 7044-225b 9 31-i acc c. Calculating alternate floor protection material thermal conductivity: k value thekvalueindicatestheamountofheat(inbtu’s)thatwillflow in1hourthrough1squarefootofauniformmaterial1inchthick foreachdegree(f)oftemperaturedifferencefromonesideof the material to the ot...

  • Page 10

    10 7044-225b april 9, 2014 31-i acc figure 10.1 recommended location marginal location location not recommended recommended location location not recommended multi-level roofs windward leeward outside air kit termination cap e.Chimneyterminationrequirements followmanufacturer’sinstructionsforclearan...

  • Page 11

    April 9, 2014 7044-225b 11 31-i acc 3ft.(91cm) minimum lessthan10ft.(305cm) 2ft.(61cm) 3ft.(91cm) minimum 10ft.(305cm) to nearest roofline 2ft.(61cm) pitched roof figure 11.1 figure 11.2 10 ft. (305cm) or more 3 ft. (91cm) minimum less than 10 ft. (305cm) 2 ft. (61cm) minimum 3 ft. (91cm) minimum wa...

  • Page 12

    12 7044-225b april 9, 2014 31-i acc 4 chimney systems d. Masonry chimney •mustmeetminimumstandardsofnfpa211. •musthaveatleast5/8inch(16mm)fireclayliningjoined with refractory cement. (installations into a clay flue without a stainless steel liner may reduce draw which affects performance, will cause...

  • Page 13

    April 9, 2014 7044-225b 13 31-i acc ul 1777 insulated stainless steel liner or other approved lining system follow manufacturer’s instructions on insulation and support for zero or other non-code clearances, follow approved liner manufacturer’s specific insulation requirements: different clearances ...

  • Page 14

    14 7044-225b april 9, 2014 31-i acc f. Prefabricated metal chimney figure 14 .1 e. Metal heat circulating masonry thechimneycanbeneworexisting,masonryorprefabricated andmustmeetthefollowingminimumrequirements: •must be minimum 6 inch (152mm) inside diameter of hightemperaturechimneylistedtoul103ht(2...

  • Page 15: Warning

    April 9, 2014 7044-225b 15 31-i acc inches millimeters minimumwidthofcavityopening-front 29-1/16 738 minimumwidthofcavityopening-rear 25-1/2 648 minimumheight 20-3/4 528 minimum depth from front to rear 17-9/16 446 damper smokeshelforbaffle embercatches fire grate viewingscreen/curtain doors thefoll...

  • Page 16

    16 7044-225b april 9, 2014 31-i acc ovalizingroundstainlesssteellinerstoaccommodatethe linerpassingthroughthedamperregionofafireplaceisan allowableandacceptablepractice. Ensure that the ovalization is minimized to the extent requiredtofitthroughthedamper. J. Ovalizing round stainless steel liners fi...

  • Page 17

    April 9, 2014 7044-225b 17 31-i acc figure 17.1 outside air cover plate (discard) rectangular outside air cover (included with side panel assembly) termination cap flex adapter a. Outside air kit installation items needed for installation (not supplied) • 4 inch flex aluminum pipe, or if using alter...

  • Page 18

    18 7044-225b april 9, 2014 31-i acc b. Disassemble firebox and outer can for easier field installation the outer can is installed with- outthefireboxsoconnectingtothefluehasgreateraccess. Thefireboxslidesintotheoutercanoncethefluecollaris attachedtothestovepipe/linerandoptionaloutsideairflex pipe is...

  • Page 19

    April 9, 2014 7044-225b 19 31-i acc figure 19.2 figure 19.3 figure 19.4 cast iron flue located on appliance drill through all 8 countersunk locations once distance is established, drill holes and secure both chambers together. Figure 19.5 c. Securing stove pipe/liner to flue collar 1.Thereare4pre-dr...

  • Page 20

    20 7044-225b april 9, 2014 31-i acc corner brackets figure 20.5 figure 20.4 secure 2 side surrounds to top surround attachment holes to outer can figure 20.6 top surround side surround # 8 screws f. Surround & trim kit installation 1. Lay surround face down on a protected surface to pre- ventscratch...

  • Page 21

    April 9, 2014 7044-225b 21 31-i acc remove 2 screws from both sides. Adjust the legs up or down to level appliance. Figure 21.4 i. Leveling legs 1. Removethe2screwsalreadyinstalledoneachleg. 2. Movelegstothedesiredheight . 3. Re-install the screws to secure in place. G. Installing firebox into outer...

  • Page 22

    22 7044-225b april 9, 2014 31-i acc j. Snap disc and side panel installation 1. Placesnapdiscboxinlocationshownin figure 22.1. 2. Secure the wires through the wire clip to keep in place. 3. Routetheblowerwiresunderneathappliancethroughthe wire channel to the other side of the appliance. Wire channel...

  • Page 23

    April 9, 2014 7044-225b 23 31-i acc strain relief green ground wire & nut disconnect wires from wire harness strain relief green ground wire & nut white (neutral) wire male spade terminal clip all 3 zip ties male terminal female terminal male terminal wire 5 inches (127mm) longer speed control attac...

  • Page 24

    24 7044-225b april 9, 2014 31-i acc double-sided tape double-sided tape screws are circled exploded view of scissors figure 24.1 thermal protection decorative tile may be installed install front trim last. Corners overlap side trim pieces expand scissors to desired height cut top edge of trim, not b...

  • Page 25

    April 9, 2014 7044-225b 25 31-i acc figure 25.1 spark arestor cap roof flashing storm collar joist shield/firestop double wall connector pipe 8. Burn wood only. Other types of fuels may generate poisonousgases(e.G.,carbonmonoxide). 9. Ifunitburnspoorlywhileanexhaustblowerisoninhome, (i.E.,rangehood)...

  • Page 26: 31I-Acc

    26 7044-225b april 9, 2014 31-i acc service parts r 31i-acc beginning manufacturing date: aug. 2009 ending manufacturing date: active important:thisisdatedinformation.Whenrequestingserviceorreplacement partsforyourappliancepleaseprovidemodelnumberandserialnumber.Allpartslisted inthismanualmaybeorder...

  • Page 27

    April 9, 2014 7044-225b 27 31-i acc.

  • Page 28

    28 7044-225b april 9, 2014 hearth & home technologies 1445 north highway colville, wa 99114 division of hni industries we recommend that you record the following pertinent information for your 31-i acc wood stove date purchased/installed: serial number: location on appliance: dealership purchased fr...