    Ce 0694 ta02e002.B1103 technical specification radiant bruciatori s.P.A. Montelabbate (pu) italy english setting instruction manual for boilers with diagnocode sm 20015 printed circuit board mod. Rsf 30 e rma 24 e x rmas 20 e x rmas 24 e x rmas 30 e rma 21 e nox x rmas 21 e/3s rba 24 e x rba 35 e x ...

  • Page 3

    P.C.B. Sm 20015 –boiler settings index control panel page 1 diagnocode sm 20015 electronic printed circuit board: page 2 error codes page 3 functions codes page 3 parameters table page 4 parameters setting procedure no. 1 page 5 2 page 5 3 page 6 4 page 6 5 page 7 6 page 7 7 page 8 8 page 8 9 page 9...

  • Page 4

    P.C.B. Sm 20015 –boiler settings 1 control panel 1 on / off power button 2 heating temperature adjustment knob 3 domestic hot water temperature adjustment knob 6 mode selection pad (summer only / winter only / summer and winter) 5 chimney-sweeper selection pad / parameter setting service pad 4 outsi...

  • Page 5

    P.C.B. Sm 20015 –boiler settings 2 diagnocode sm 20015 electronic printed circuit board cod. 76655la m3 m5 m6 m7 m11 m13 m2 m4 m1 m12 m10 m8 m9 technical specification new generation printed circuit board with easy settings of boiler parameters. Special features: : exclusively for technicians settin...

  • Page 6

    P.C.B. Sm 20015 –boiler settings 3 error codes: ionisation lock-out high limit thermostat lock-out flue safety thermostat lock-out (for open chamber models only) water pressure switch lock-out heating sensor failure domestic hot water sensor failure storage tank water sensor failure air pressure swi...

  • Page 7

    P.C.B. Sm 20015 –boiler settings 4 parameters table parameter number type of operation parameter value function page 0 boiler type selection 00 ™01 wall mounted or floor standing oil floor standing unit 1 boiler type selection 00 01 02 instantaneous with storage cylinder with storage cylinder-comfor...

  • Page 8

    P.C.B. Sm 20015 –boiler settings 5 parameter 1 setting: boiler type selection to modify the parameter value : a. Put on/off button 1 in off position ( ); b. Push pad 6 and simultaneously and keep them pressed; c. Put on/off button 1 in on position ( ) and wait until the display shows - ; d. Release ...

  • Page 9

    P.C.B. Sm 20015 –boiler settings 6 parameter 3 setting: heating temperature setting to modify the parameter value : a. Put on/off button 1 in off position ( ); b. Push pad 6 and simultaneously and keep them pressed; c. Put on/off button 1 in on position ( ) and wait until the display shows - ; d. Re...

  • Page 10

    P.C.B. Sm 20015 –boiler settings 7 parameter 5 setting: water-hammer prevention setting to modify the parameter value : a. Put on/off button 1 in off position ( ); b. Push pad 6 and simultaneously and keep them pressed; c. Put on/off button 1 in on position ( ) and wait until the display shows - ; d...

  • Page 11

    P.C.B. Sm 20015 –boiler settings 8 parameter 7 setting: pump overrun - heating circuit adjustable from 0 to 7.5 minutes. Factory calibrated at 3 minutes standby. (n.B. Do not set the overrun time under 3 minutes) to modify the parameter value : a. Put on/off button 1 in off position ( ); b. Push pad...

  • Page 12

    P.C.B. Sm 20015 –boiler settings 9 d 10 20 30 40 manometro 9 : mechanical minimum gas pressure setting the mechanical minimum gas pressure is factory calibrated on all boilers at 17/18 mmh20. When replacing the gas valve adjust the mechanical minimum pressure as follows: : • using a single cut screw...

  • Page 13

    P.C.B. Sm 20015 –boiler settings 10 d b 10 20 30 40 a manometro c parameter 11 setting: maximum gas pressure setting - maximum heating output setting to check or modify the existing pressure value: a. Insert a manometer into the gas valve pressure point b (fig.1); b. Put on / off button 1 in off pos...

  • Page 14

    P.C.B. Sm 20015 –boiler settings 11 d b 10 20 30 40 a manometro c parameter 11 setting: maximum heating output setting to check or modify the existing pressure value: a. Insert a manometer into the gas valve pressure point b (fig.1); b. Put on/off button 1 in off position ( ); c. Push pad 6 and simu...

  • Page 15

    P.C.B. Sm 20015 –boiler settings 12 maximum heating output gas pressure diagrams for 24 kw output boilers (g20 - g30/31) lpg natural gas 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 gas pressure in mbar out put ca...

  • Page 16

    P.C.B. Sm 20015 –boiler settings 13 maximum heating output gas pressure diagram for 32 kw output boilers (g20 - g30/31) metano g.P.L. 14 16 18 20 22 24 26 28 30 32 34 36 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 pressione gas in mbar p o rtata term i...

  • Page 17

    P.C.B. Sm 20015 –boiler settings 14 wiring diagrams – open combustion chamber boilers printed circuit board cvi-m sm20015 (cod. 76655la) r 22 m4 m4 19 18 21 20 c br ow n lig ht- bl ue lig ht -b lu e bl ac k s c br ow n vd re d electric connection with mater xp300 water pressure switch 50 bl ac k bl ...

  • Page 18

    P.C.B. Sm 20015 –boiler settings 15 wiring diagrams - room sealed boilers printed circuit board cvi-m sm20015 (cod. 76655la) r 22 m4 m4 19 18 21 20 c br ow n light- blue light- blue bl ac k s c br ow n vd re d electric connection with mater xp300 water pressure switch 50 bl ac k bl ac k bl ac k bl a...

  • Page 19

    P.C.B. Sm 20015 –boiler settings 16 wiring diagram for remote control installation (no zone valves) fit the interface (fig. 2) on the circuit board (fig. 1) into the holes a and b provided (see fig. 1). Connect plug m1 on the interface circuit board (fig. 2) to plug m11 on the modulation circuit boa...

  • Page 20

    Radiant bruciatori s.P.A. Via pantanelli, 164/166 - 61025 loc. Montelabbate (pu) tel. +39 0721 9079.1 • fax. +39 0721 9079279 e-mail: tecnico@radiant • internet: http://www.Radiant.It all descriptions and illustrations contained in this leaflet have been carefully prepared but we reserve the right t...